Conconully Dam, WA, Safety of Dams Modification
- Client
- Department of the Interior
- RFP Number
- —
- Posted
- —
- Category
- US Federal
- Budget
- —
- NAICS
- 237990
- Set-aside
- —
- Contact
- Fleming, Lance
- [email protected]
Description
AI GeneratedThe Bureau of Reclamation seeks information and industry feedback for anticipated seismic modifications at Conconully Dam in Washington. The anticipated scope includes utility coordination, site clearing, instrumentation removal, earthwork, deep soil mixing, outlet works tunnel preparation, and temporary bypass pumping or siphoning. Additional work encompasses rock excavation, outlet works piping and valve house construction, channel construction, and stability berm installation featuring drains, pipes, and outfall structures. This notice serves solely as market research, and the buyer will not accept formal bids, award a contract, or pay for response costs under this announcement. The buyer does not provide eligibility criteria, submission instructions, question deadlines, evaluation methods, contract terms, or budget details.
Official SAM.gov notice
- Solicitation number
- 140R1026R0004
- Agency
- Department of the Interior
- Buying office
- Bureau of Reclamation › Pacific NW Region PN 6615
- Notice type
- Sources Sought
- Responses due
- Sep 30, 2026, 7:00 PM ET
- Posted on SAM.gov
- Sep 10, 2026
- NAICS
- 237990 · Other Heavy and Civil Engineering Construction
- Product/service code
- Y1MD
- Place of performance
- Conconully, WA, 98819
- Contracting contact
- Fleming, Lance
[email protected]
2083785338
Read the official notice description
NOTICE TYPE: Sources Sought / Industry Day Invite SUBJECT: Bureau of Reclamation Safety of Dams, Conconully Dam Seismic Modifications, Industry Day Invite 1. DISCLAIMER: This is a Sources Sought Notice/Industry Day Invitation only. This notice is issued solely for market research, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement or contract. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party. Any future solicitations will be announced under a different solicitation number. Solicitation number 140R1026R0004 will be rendered obsolete after September 30th, 2026. 2. PROJECT OVERVIEW: The Department of Interior, Bureau of Reclamation is conducting a Sources Sought Notice/Industry Day Invitation for the Conconully Dam Seismic Modification project. 3. SCOPE OF WORK: Critical components of work for the project are anticipated to include: A. Coordinate power, fiber, and telecommunications to the site including temporary and permanent installations. B. Clearing, grubbing, and stripping of the work area and borrow areas. C. Abandoning and removing existing site instrumentation including piezometers, weirs, shear strips, and seismic installations. D. Earthwork for construction preparation and embankment construction. E. Deep soil mixing of foundation materials. F. Preparation of outlet works tunnel for outlet works lining and extension. G. Performing bypass pumping or providing siphon flows over the spillway to meet in channel flow requirements during non-irrigation season to allow outlet work construction. H. Excavation of outlet works alignment and Salmon Creek Access Road on the left abutment including rock excavation, cleaning, and rock slope stabilization. I. Construction of outlet works piping including grout encasement and concrete encasement, drainage system, backfill, and inspection well. J. Construction of a new outlet works valve house structure including placement of piping, valves, miscellaneous metalwork, retaining structures, and backfill. K. Rock excavation and channel construction from the new valve house to connection with the existing Salmon Creek channel. L. Construction of the stability berm including: 1. Foundation and bedrock cleaning and preparation, 2. Furnishing and installing filter and gravel blanket and chimney drains, 3. Furnishing and installing perforated and non-perforated high-density polyethylene (HDPE) toe drainpipes, cleanouts, inspection wells, flow measurement weirs, and associated outfall structures. 4. Furnishing and installing the upper and lower Fiber Optic Sensing Cables. 5. Excavating, screening, and transporting borrow material for the embankment berm fill. 6. Furnishing and installing new embankment piezometers and embankment measurement points. M. Installation and construction of relief wells, vaults, and associated piping. N. Final grading and construction of new dam access roads, security gates, and site fencing. O. Final grading and construction of the boat ramp within the Graveyard Flat borrow area. P. Preparing all disturbed areas for future restoration through tracking with equipment to leave rough surfaces. 4. Acquisition Information: - Rough Order of Magnitude (ROM): The Government anticipates a ROM of $80,000,000 to $100,000,000. - Projected Solicitation Date: The Government target solicitation period is late Fiscal Year (FY) 2027 or early FY 2028. - Period of Performance (POP): Approximately 3 years 5. ACTION REQUIRED & SUBMISSION INSTRUCTIONS: Interested industry partners are requested to review the Attachment a. Industry Day Invitation to Industry Partners for action requirements and coordinating information. 6. Attachments: a) Industry Day Invitation b) Reclamation FIST 1-1 Hazardous Energy Control Program c) Non-Disclosure Agreement (NDA)
Source: SAM.gov contract opportunities data (U.S. federal public data).
Incumbent
Likely prior awards for this requirement
Likely matchAwarded by the same buying office (140R10) with descriptions matching "conconully", performed in WA. The notice does not name its current contract, so confirm before relying on it.
| Vendor and award | Value | Ends |
|---|---|---|
| KELLER NORTH AMERICA, INC.140R1022C0004 · CONCONULLY DAM CAS PHASE II SEISMIC MODIFICATIONS FOUNDATION IMPROVEMENT TEST SECTION OKAN | $1.6M | Feb 10, 2023 |
Market context
Awards in the same category (Other Heavy and Civil Engineering Construction). This is not this requirement's award history.
Recent similar awards: Department of the Interior, NAICS 237990, performed in WA
| Vendor and award | Value | Ends |
|---|---|---|
| ANDRITZ HYDRO CORP140R1019C0008 · GRAND COULEE JOHN W. KEYS III PUMP-GENERATING PLANT EXCITATION SYSTEM, GOVERNOR, AND PROTE | $34.6M | Sep 2, 2028 |
| PIPKIN INC.140R1026C0005 · EO 14398 - LEAVENWORTH NATIONAL FISH HATCHERY SURFACE WATER INTAKE FISH SCREENS AND FISH P | $3.8M | Aug 29, 2028 |
| DOYON TECHNICAL SERVICES, LLC140L0626C0020 · GARNET HILL RECREATION AREA CONSTRUCTION | $4.7M | Dec 31, 2027 |
| WHH NISQUALLY FEDERAL SERVICES, LLC140R1025C0004 · CLEAR CREEK DAM FISH PASSAGE FACILITY, YAKIMA PROJECT, WASHINGTON | $1.3M | Dec 24, 2027 |
| REHBEIN ENTERPRISES INC140R1026C0004 · SPEELYI BEACH SHORELINE PROTECTION, YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN | $2.3M | Sep 30, 2027 |
Top vendors in this category: Department of the Interior, NAICS 237990, since Oct 1, 2023
424 contract awards in this NAICS over the period.
- 1. NW CONSTRUCTION, INC$454.2M
- 2. KIEWIT INFRASTRUCTURE WEST CO.$321.2M
- 3. AMES FEDERAL CONTRACTING GROUP LLC$115.1M
- 4. STONE & LIME IMPORTS, INC$55.5M
- 5. COASTAL CONSTRUCTION GROUP, LLC$48.8M
Source: USAspending.gov federal award data (U.S. federal public data). A contract is called the incumbent only when the notice or its documents cite it by number.
Source and verification
Original sourceCraxy AI summarizes this opportunity from the original listing and available solicitation documents. Confirm submission instructions and amendments with the issuing source before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score