Construction Services
- Client
- Greeley, Colorado
- RFP Number
- CONS-24509
- Posted
- 10/7/2026
- Category
- Construction, Architecture, Interior Design, Landscaping and Other Related Services
- Budget
- Looking for Proposals
- NAICS
- —
- Set-aside
- —
- Contact
- —
Description
AI GeneratedThe government authority in Greeley, Colorado requires a vendor to provide construction services for the abandonment of an existing water system located in back yards. The selected vendor must connect new meter pits located on the front of each lot to the existing plumbing of residents, while city construction crews handle the installation of new waterlines and meter pits within city rights-of-way. Only onshore US organizations are eligible to bid, and performance of the work must take place onsite. Interested vendors must attend a pre-bid meeting on October 13, 2026, and submit all questions by October 16, 2026. The buyer is currently seeking proposals to determine the budget for this project.
Key solicitation details
AI-extracted from F26-10-052 - Farr Neighborhood - Phase1d - Services Connections_Final.pdf. Confirm against the original documents before bidding.
The City of Greeley Water and Sewer Department is requesting proposals for the Farr Neighborhood Phase 1d Service Connections project. Work includes abandoning existing backyard water systems and connecting new front lot meter pits to residents' plumbing. Eligible offerors must submit electronic responses.
- Issued by
- City of Greeley
- RFP Issued
- Tuesday, October 6, 2026, at 5:00 PM
- Mandatory Pre-Proposal Conference
- Tuesday, October 13, 2026, at 10:00 am
- Inquiry Deadline
- Friday, October 16, 2026, 5:00 PM
- Final Addendum Issued
- Wednesday, October 21, 2026, at 5:00 PM
- Proposal Due Date
- Tuesday, October 27, 2026, at 5:00 PM
- Notice of Award (tentative)
- Friday, October 30, 2026, at 5:00 PM
- How to submit
- Electronic via email
- Submission details
- Submitted in a single Microsoft Word or PDF file under 20MB. Maximum 20 pages, 11-point font or larger. RFP number and Project name must be in the subject line.
- Contract term
- Ninety (90) days from the date of executed contract
- Place of performance
- Farr Neighborhood, Greeley, Colorado
- Insurance and bonding
- Commercial General Liability minimum limit $2,000,000; Worker's Compensation per Colorado statutory limits; Comprehensive Automobile Liability minimum $1,000,000 bodily injury/property damage.
How proposals are evaluated
| Proposed Project Schedule | 20 Points |
| Value/Cost of Efforts | 40 Points |
Scope of work
- Abandonment of existing backyard water systems
- Installation of new private water services from new front meter pits to existing resident plumbing
- Coordination with City construction crews and residents
- Reconstruction of any damaged city assets to current city standards if removed
- Execution of resident work plans as specified
- Erosion and sediment control plan implementation
Minimum qualifications
- Attendance at mandatory pre-proposal conference
- Licensed or authorized to perform work and obtain required permits
Documents to include with the bid
- Proposal Response
- Proposal Acknowledgement (Exhibit 1)
- Certificate of Insurance (Exhibit 3)
- Debarment Form (Exhibit 4)
- Proposed Project Schedule
- Cost Proposal / Pricing Schedule
- Declaration of attendance for pre-bid conference
Verify important details
Document checkConfirm submission instructions and amendments with the issuing agency before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score