Supervisory Control and Data Acquisition Substation Controls Upgrade Service
- Client
- Ephrata, Washington
- RFP Number
- CSE-24908
- Posted
- 10/16/2026
- Category
- CCTV and Security Services and Supplies
- Budget
- Looking for Proposal
- NAICS
- —
- Set-aside
- —
- Contact
- —
Description
AI GeneratedThe government authority in Ephrata, WA requires a contractor to provide supervisory control and data acquisition (SCADA) substation controls upgrade services. The scope encompasses installing, integrating, testing, commissioning, troubleshooting, and cutting over new SCADA equipment, network communications, control panels, wiring, fiber connections, and power supplies. Additionally, the contractor must perform field investigations, retrofits, panel modifications, demolition of obsolete equipment, documentation updates, and operational cutovers. Eligible contractors must operate onshore within the USA, and all performance must occur onsite. The buyer will evaluate submitted proposals for this flexible procurement vehicle, which will operate under work authorizations over a one-year contract term. Interested vendors must submit their proposals directly to the issuing government agency in accordance with their procurement guidelines.
Key solicitation details
AI-extracted from 7.pdf. Confirm against the original documents before bidding.
The District is seeking to prequalify experienced electrical, controls, and SCADA integration contractors for a competitively bid Unit-Priced Time and Materials Public Works Contract. The contract supports SCADA modernization activities at the White Trail and Braden Substations. Designation as a pre-qualified contractor is required to be eligible to bid as a Prime Contractor.
- Issued by
- Public Utility District No. 2 of Grant County, Washington
- Questions due
- no later than five business days prior to the due date of the prequalification submittal
- Submission Deadline
- November 3rd 2026, 2:00PM PST
- Advertise and post solicitation
- Q4 2026
- Contract Award
- Q1 2027
- Contract Completion
- Q4 2027
- How to submit
- Courier (Federal Express or United Parcel Service only), hand delivered/dropped-off, or email
- Submission details
- Submit three copies by courier/hand delivery to Beau Schwab, Procurement Officer, Public Utility District No. 2 of Grant County, WA, 30 C Street SW, Ephrata, WA 98823, or email to [email protected].
- Contract term
- Contract completion targeted for Q4 2027
- Place of performance
- White Trail Substation (47°09'43.90"N 119°43'33.66"W) and Braden Substation (47°05'21.54"N 119°43'37.76"W), Washington
- Insurance and bonding
- Commercial General Liability: $1,000,000 per occurrence, $1,000,000 Personal Injury, $2,000,000 General Aggregate, $2,000,000 Products/Completed Operations Aggregate. Workers Compensation & Stop Gap Employers Liability: $1,000,000. Automobile Liability: $1,000,000. Excess/Umbrella Liability: $5,000,000. Professional Liability/Network Security: $10,000,000 per claim/aggregate. Surety bonding capacity letter required.
- Funding
- Washington State prevailing wages under RCW 39.06.020, Title 51 RCW, Title 54.04 RCW
How proposals are evaluated
| Experience in successful completion of similar work | |
| Qualifications and experience of proposed project personnel |
Scope of work
- SCADA equipment installation and replacement
- RTU and PLC installation, configuration, and testing
- Network switch, router, and communications device installation
- SCADA panel modifications and wiring
- Fiber optic and communication system connections
- Point-to-point verification and testing
- System commissioning and cutover support
- Troubleshooting and corrective modifications
Minimum qualifications
- Registered contractor under provision of RCW 18.27
- Unified Business Identifier (UBI) nine digit number per RCW 18.27 and 19.28
- In the business of installing utility automation, protection and control systems, SCADA integration, substation electrical construction, and commissioning services
- Onsite Superintendent with at least 10 years experience with similar SCADA equipment installations in a Utility Substation and minimum five SCADA projects
- Proposed Project Manager with at least 10 years experience performing work with similar types of post tension anchors
- Proposed Scheduler with minimum 3 years experience, certified in Primavera Project Planner (P6) or approved alternate software
Documents to include with the bid
- Application for Contractor Prequalification
- List of principal officers, length of time with company, and years of experience
- List of clients served within the last three years with project details
- Copy of contractor registration number per RCW 18.27
- Company Resume setting forth experience, technical qualifications, and organizational ability
- Letter from surety company stating bonding capacity limits
- Organizational chart identifying key personnel and management structure
- Resumes and proof of employment for key onsite personnel (Superintendent, Project Manager, Scheduler)
- List of applicant-owned specialty equipment
- Technical proposal for installing the project (work sequencing and estimated rate of progress)
Verify important details
Document checkConfirm submission instructions and amendments with the issuing agency before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score