Collaborative Design-Build Services
- Client
- Fullerton, California
- RFP Number
- CONS-23651
- Posted
- —
- Category
- Construction, Architecture, Interior Design, Landscaping and Other Related Services
- Budget
- Looking for Proposals
- NAICS
- —
- Set-aside
- —
- Contact
- —
Description
AI GeneratedThe government authority in Fullerton, CA seeks a USA-based organization to provide collaborative design-build services for the renovation and expansion of the existing Titan Student Union and Student Recreation Center. The buyer requires the vendor to perform the work onsite, which involves renovating approximately 48,000 square feet of the existing facility. Additionally, the vendor must construct an approximately 18,900 square foot, two-story addition on the south side of the building, dedicating roughly 13,400 square feet of this new addition to Basic Needs programs and services. The buyer requests proposals to establish the project budget and accepts digital response submissions via email or online. Interested vendors may attend a non-mandatory conference on September 15, 2026. The buyer requires vendors to submit all questions no later than October 6, 2026. The provided text contains no further details regarding eligibility or evaluation criteria.
Key solicitation details
AI-extracted from LS26001_-_Request_for_Qualifications_-_Final.pdf. Confirm against the original documents before bidding.
California State University, Fullerton is seeking Statements of Qualifications for collaborative design-build services to renovate and expand the existing Titan Student Union and Student Recreation Center. The project covers extensive interior renovations and multiple new structural additions. Bidding is open to onshore USA organizations prequalified by the CSU Chancellor's Office.
- Issued by
- California State University, Fullerton
- RFQ Advertised
- 08/31/2026
- RFQ Conference (Non-Mandatory)
- 09/15/2026 @ 10:00 a.m.
- Last day to submit application for prequalification on PlanetBids
- 10/06/2026
- Last day to submit RFQ questions
- 10/06/2026
- Last day to submit Affidavit of Joint Venture form
- 10/13/2026
- RFQ Addenda issued (if required)
- 10/13/2026
- Statement of Qualifications due
- 10/20/2026 @ 3:00 p.m.
- Proposer Shortlist published by e-mail
- 10/29/2026
- RFP distributed to shortlist
- 10/30/2026
- Pre-Proposal Meetings
- 11/10/2026
- How to submit
- Sealed hard copy and digital file
- Submission details
- Deliver three (3) copies in 8 1/2 x 11 format and one digital PDF file in a sealed package marked SOQ for [Project Name, Project No., Campus] to the Contracts and Procurement Office.
- Contract term
- Phase 2 duration is approximately 915 calendar days
- Estimated value
- $215,960,000.00
- Place of performance
- California State University, Fullerton, 2600 Nutwood Avenue, Suite 300, Fullerton, CA 92831
- Insurance and bonding
- Payment and performance bond premiums are required as part of the Phase 2 GMP agreement. Liquidated damages are $5,000.00 per calendar day late.
- Funding
- Disabled Veteran Business Enterprise (DVBE) 3% minimum subcontracting requirement and prevailing wage laws apply.
How proposals are evaluated
| Project Specific Requirements (Student Union/Recreation Center experience) | 50 points |
| Respondent's general design-build experience (GC and AE joint work) | 80 points |
| General Contractor's Student Union and Student Recreation Center Experience | 70 points |
| Architect's Student Union and Student Recreation Center Experience | 80 points |
| Respondent's experience utilizing DVBE subcontractors | 30 points |
| Composite Weighted Safety Score ranking | 50 points |
| Respondent's unique qualifications to perform on this Project | 40 points |
| Respondent's experience within 60 miles of the Project | 10 points |
| History of penalties paid for failure to pay prevailing wages in past 5 years | 40 points |
Scope of work
- Programming, schematic design, and design development for the ASI Wellness Initiative project
- Renovation of approximately 48,000 square feet of the existing Titan Student Union facility
- Construction of a 18,900 square foot two-story addition to the Titan Student Union
- Renovation of approximately 92,000 square feet of the existing Student Recreation Center
- Construction of approximately 25,000 square feet of new additions for a Wellness Center and expanded fitness areas
- Approximately 44,000 square feet of site improvements, including intramural field enhancements
- Prequalification, trade package development, and bidding for trade subcontractors
- Construction management, preconstruction quality assurance, and execution under a Guaranteed Maximum Price (GMP)
Minimum qualifications
- Design-Builder licensed in California with a 'B' license
- Registered to bid public works with California Department of Industrial Relations (DIR)
- Prequalified by CSU Prequalification Program Administrator one day prior to SOQ due date
- Prequalification rating greater than budgeted Phase 2 agreement amount
- Architect licensed in the state of California
Documents to include with the bid
- Cover letter confirming SOQ submission, willingness to enter contracts, and accuracy under penalty of perjury
- Organization Information for General Contractor and Architect
- Copy of Respondent's CSU prequalification letter
- Copies of Respondent's California Contractor's License and DIR public works registration number
- Lawsuit history with Project owners in the last 5 years
- Team experience matrix, references, and descriptions for GC and Architect
- Affidavit of joint venture (if applicable)
Verify important details
Document checkConfirm submission instructions and amendments with the issuing agency before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score