Construction Manager at Risk Services
- Client
- Gilbert, Arizona
- RFP Number
- CONS-23541
- Posted
- —
- Category
- Construction, Architecture, Interior Design, Landscaping and Other Related Services
- Budget
- Looking for Proposals
- NAICS
- —
- Set-aside
- —
- Contact
- —
Description
AI GeneratedThe government authority in Gilbert, Arizona seeks a vendor to provide construction manager at risk services for a multi-use pathway project. The buyer requires the vendor to deliver design and construction phase services to support the project's buildout. The requested scope of improvements includes a 10-to-12-inch paved multi-use pathway, landscaping, and lighting. The vendor must perform all work onsite. The buyer limits eligibility to onshore United States organizations only. The buyer is looking for proposals regarding the project budget. The buyer will hold a pre-bid meeting on September 15, 2026.
Key solicitation details
AI-extracted from PR13491350 CIP422 AE RFQ For CMR Project.pdf. Confirm against the original documents before bidding.
The Town of Gilbert is requesting Statements of Qualifications for Architect/Engineering (A/E) services for a Construction Manager at Risk project. The work covers design and construction phase services for approximately 3 miles of the Regional Western Powerline Multi-Use Path corridor. Qualified A/E firms with CM@R experience are eligible to submit proposals.
- Issued by
- Town of Gilbert
- Pre-submittal conference
- September 15, 2026 at 11 a.m. Arizona Local Time
- Questions due
- 5 p.m. Arizona Local Time on September 22, 2026
- Proposals due
- 12 p.m. Arizona Local Time, October 6, 2026
- How to submit
- Electronic via the Town of Gilbert electronic bidding platform
- Submission details
- Single PC readable, non-password protected .pdf document. Maximum of 12 pages plus a one-page cover letter and Appendix A. Font size minimum 11.
- Estimated value
- PR1349 - $8,412,000 & PR1350 - $12,513,000
- Place of performance
- Regional Western Powerline Multi-Use Path corridor beginning on the east side of Lindsay Road and extending approximately 3 miles to the east side of Recker Road, Gilbert, Arizona
How proposals are evaluated
| Project Understanding and Management Approach | 25 |
| Schedule and Cost Control Ability | 10 |
| Quality Control Ability | 5 |
| A/E Firm Experience and Capability for Work | 10 |
| Proposed Project Manager | 25 |
| Proposed Project Staff | 10 |
| References (Past performance verification) | 15 |
Scope of work
- Design and construction phase services
- 10-12 inch paved multi use pathway
- Landscaping
- Lighting
Minimum qualifications
- Qualified Architect/Engineering (A/E) firms with experience in the Construction Manager at Risk (CM@R) project delivery method
Documents to include with the bid
- Statement of Qualifications (SOQ)
- One-page cover letter with acknowledgement of all addenda
- Organization chart
- Appendix A
- Exhibit A: Past Performance Verification Evaluation Submittals
- Past Performance Verification Forms
Verify important details
Document checkConfirm submission instructions and amendments with the issuing agency before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score