Request for Information for On-Site Fabrication and Assembly of a Three-Bay High-Performance Magazine (HPM) Structure
- Client
- U.S. Army Engineer Research and Development Center
- Solicitation No.
- —
- Posted
- 10/22/2026
- Category
- US Federal
- Budget
- —
- NAICS
- 238120
- Set-aside
- —
- Contact
- Shinita Jordan
Description
AI GeneratedThe U.S. Army Corps of Engineers Engineer Research and Development Center issued a Request for Information to conduct market research regarding the on-site fabrication and assembly of a three-bay High-Performance Magazine reinforced concrete test structure. The scope requires mobilizing materials and equipment to a Government test range at Fort Polk, LA, erecting formwork, installing continuous reinforcing steel cages, placing self-consolidating concrete, installing structural sand fill, and constructing reinforced concrete doors. All site activities must be completed within 240 days after contract award. Submissions must come from a United States-owned and US-based contractor. The Government is collecting information to assess acquisition alternatives, and responses to this notice are not formal offers.
Key solicitation details
AI-extracted from DRAFT DoR_3-Bay HPM_Ft Polk_21OCT2026.pdf. Confirm against the original documents before bidding.
The U.S. Army Engineer Research and Development Center requires the procurement of materials and on-site fabrication and assembly of one monolithic, three-bay High-Performance Magazine reinforced concrete test structure. The structure is for experimental testing purposes and will be completely destroyed during testing. Eligible contractors must be United States owned companies.
- Issued by
- U.S. Army Engineer Research and Development Center
- Mobilization Notice
- Minimum 14 calendar days prior to mobilizing equipment to the site
- Pre-Placement Concrete Inspection Notice
- Minimum 48 hours notice required
- Pre-Fill Cavity Inspection Notice
- Minimum 48 hours notice required
- Final Inspection Notice
- Minimum 5 business days notice required
- Site Activities Completion
- NLT 240 days after contract award
- Contract term
- 240 days after contract award
- Place of performance
- Range 19, Mill Creek Road, Fort Polk, Louisiana 71459
Scope of work
- Procure, deliver, and install prefabricated ASTM A615 Grade 60 rebar cages
- Procure and place 10,000 PSI Self-Consolidating Concrete for foundation, walls, roof, and doors
- Procure, deliver, and install dry structural sand fill into wall cavities to 100 PCF density
- Design, fabricate, erect, and remove temporary formwork systems
- Erect formwork and place concrete for three reinforced concrete blast doors and steel closure plates
- Procure and install required embedded items, sleeves, and plates
- Place sand and earth protective berm over the roof and against retaining walls
Minimum qualifications
- Contractor performing work must be a United States (US) owned company
Documents to include with the bid
- Detailed concrete mix design
- Formwork plan including hydrostatic pressure calculations and bracing details
- Detailed concrete placement plan
- Certified concrete cylinder break data
- On-site plastic concrete test results
Official SAM.gov notice
- Solicitation number
- W912HZ27X1CTB
- Agency
- Department of Defense
- Buying office
- Dept of the Army › W2R2 USA Engr R & D CTR
- Notice type
- Sources Sought
- Responses due
- Nov 4, 2026, 4:00 PM ET
- Posted on SAM.gov
- Oct 21, 2026
- NAICS
- 238120 · Structural Steel and Precast Concrete Contractors
- Place of performance
- Fort Polk, LA, 71459
- Contracting contact
- Shinita Jordan
Shinita.M.Jordan@usace.army.mil - Additional contact
- SONIA BOYD
SONIA.J.BOYD@USACE.ARMY.MIL
Read the official notice description
THIS IS A REQUEST FOR INFORMATION (RFI) ONLY AND YOUR RESPONSE IS NOT AN OFFER. SERIOUS INQUIRIES ONLY AND SUBMISSIONS MUST BE FROM A US-BASED CONTRACTOR. THIS IS NOT A REQUEST FOR QUOTES (RFQ). NO SOLICITATION IS AVAILABLE AT THIS TIME. THIS REQUEST FOR INFORMATION DOES NOT COMMIT THE GOVERNMENT TO PAY ANY COSTS INCURRED IN PREPARATION OF ANY SUBMISSION TO THIS NOTICE, OR TO CONTRACT FOR ITEMS/SERVICES. This Request for Information (RFI) is issued solely for information and planning purposes and does not constitute a solicitation. All information received in response to this RFI marked Proprietary will be handled accordingly. Responses to the RFI will not be returned. Information provided in response to this RFI will be used to assess tradeoffs and alternatives available for determining how to proceed in the acquisition process for a solution. In accordance with RFO 15.101(c)(2), responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. BACKGROUND/PURPOSE: The U.S. Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) is conducting market research to determine sources’ competencies and capabilities to execute the on-site fabrication and final assembly of a three-bay, monolithic reinforced concrete High-Performance Magazine (HPM) structure. This is for a test structure for experimental purposes only and in the course of testing the structure will be completely destroyed and the site will be retrograded. The scope requires the full, in-situ assembly of the HPM structure at a designated Government test range at Fort Polk, LA. The process involves mobilizing all materials and equipment to the site, erecting temporary formwork systems, installing reinforcing steel cages, and placing concrete to form the final test structure according to the attached Description of Requirement (DOR). This is not a pre-cast or modular system; the final deliverable is the fully assembled and cured structure fabricated at its final location. The primary materials to be procured and processes to be performed are listed below. Reinforcing Steel (Rebar): Procure, deliver, and install prefabricated steel reinforcement into a intergrated cage within the formwork Cast-in-Place Concrete: Procure and received ready-mix concrete; place material into the erected formwork; perform consolidation, finishing and curing. Structural Sand Fill: Procure, deliver, and install sand into desiginated wall cavities post-concrete. Concrete Formwork: Fabricate or procure formwork panels; perform on-site erection, bracing, and subsequent stripping of the complete system for walls, slabs, and doors. Reinforced Concrete Doors: Perform on-site formwork erection, rebar installation, and concrete placement for three separate door components. Embedded Items: Procure and install all required embeds, sleeves, and plates within the formwork prior to concrete placement. A DRAFT Description of Requirement (DOR), which includes a detailed description of the structure, is attached. Please note this is subject to change. The purpose of this Request for Information (RFI) is to obtain information on the availability and capability of vendors to procure the necessary raw materials, provide shipping of materials and equipment to Fort Polk, LA, and perform the complete on-site fabrication and assembly of the structure to specification. Additionally, this RFI seeks to determine industry interest in participation for market research purposes before a Request for Quote (RFQ) is released for these requirements. Not responding to this RFI does not preclude participation in any future RFQ or RFP, if any is issued. If a solicitation is released, it will be synopsized on the SAM.gov website. It is the responsibility of the potential offerors to monitor this site for additional information pertaining to this requirement. Respondents are requested to review the attached DRAFT DOR and submit responses to the following questions: 1. Contact information: Interested organizations should respond by providing the Government the following information: Company name, Address, Point of Contact, business title, Telephone number, Email address, Company Cage Code, Primary NAICS, Business Size, i.e., Large, Small (if small, state your category). Current Registration in SAM, Webpage address. 2. Capabilities Statement: A description of capabilities in providing 1) the minimum required items and capabilities described in the RFI and Draft DOR to the specified location(s) and 2) Experience. Previous procurement information, including contract numbers and customers, is recommended. 3. Business Status (based on NAICS 238120): Please indicate the business status of your company (Socio-Economic Factors: 8(a), HUBZone, Service-Disabled Veteran-Owned Business, Small Disadvantaged Business etc.). 4. Answer the following Questions: All interested contractors are requested to provide comprehensive written responses to the questions below. Question #1- Project Experience: Provide at least two (2) and no more than four (4) examples of projects completed by your company within the last 7 years that are of a similar scale and complexity to the HPM structure. For each project, provide the following details: Project Name and a brief description. Final concrete compressive strength(s) and total cubic yards placed. Approximate final reinforcing steel density (lbs/CY). A summary of your company's role (e.g., Prime Contractor, Concrete Subcontractor). Question #2- Self-Consolidating Concrete (SCC) Experience: The requirement is for 10,000 PSI SCC. Describe your company's experience with high-strength SCC. Specify your approach to: Mix design submittal and verification. Managing the high fluid pressure of SCC on formwork systems. On-site Quality Control testing Question #3- Formwork Systems: This project requires a robust, engineered formwork system. Does your company have in-house engineering capability to design and develop formwork plans, or is this service subcontracted? Please describe a challenging formwork scenario your company has successfully managed on a past project. Question #4- Reinforcing Steel: The project specifications require continuous, non-spliced rebar in many areas. Describe your company's experience and methods for installing long, heavy, and continuous reinforcing steel in congested, multi-layered wall and slab assemblies. Question #5- Core Competencies (Self-Perform vs. Subcontract): Please indicate which of the following core activities your company typically self-performs versus subcontracts: Heavy Concrete Formwork Design and Erection Reinforcing Steel Installation Concrete Placement and Finishing Earthwork and Site Logistics Materials QC Testing Question #6- Overall Capability: After reviewing the Description of Requirement, does your company have the capability to procure all materials and fully execute the on-site fabrication and assembly of the HPM structure as specified? If not, please specify which items or processes cannot be provided and why. Interested vendors must provide the above information no later than 3:00 PM Central Standard Time (CST) on 04 November 2026. Responses must be emailed to Shinita Jordan at [email protected] AND Sonia Boyd at [email protected]. Any questions related to this notice must be submitted in writing to Shinita Jordan and Sonia Boyd. Verbal questions will NOT be accepted. The Government will not reimburse companies for any costs associated with the submissions of their responses.
Source: SAM.gov contract opportunities data (U.S. federal public data).
Incumbent
No incumbent history found for this requirement. The notice does not cite a current contract, and no earlier award from this buying office matches it.
Market context
Awards in the same category (Structural Steel and Precast Concrete Contractors). This is not this requirement's award history.
Recent similar awards: Department of Defense, NAICS 238120
| Vendor and award | Value | Ends |
|---|---|---|
| SOUTHEASTERN INDUSTRIAL CONSTRUCTION, LLCN6945026C0019 · TRF REPLACE FOUR CRYOGENIC TANKS | $3.3M | Feb 17, 2028 |
| CONSTRUCTION SOLUTIONS GROUP, LLCW912ES26CA017 · GULL LAKE SELF-CONTAINED FLUSH VAULT RESTROOM INSTALLATION AND REMOVAL OF EXISTING VAULT T | $480.5K | Oct 15, 2027 |
| ROCKVILLE FUEL & FEED COMPANY, INCORPORATEDW91QV125CA025 · THIS REQUIREMENT IS FOR NON-PERSONAL SERVICES CONTRACT TO PROVIDE AND INSTALL GRAVE LINERS | $3.6M | Feb 28, 2027 |
| PRIME VERITAS GENERAL TRADING & CONTRACTINGFA570226P0012 · 200 T-WALL AND 200 C-CHANNEL | $298.0K | Sep 22, 2026 |
| JTG CORPORATION PTE. LTD.W91QVP26P1311 · BILL OF MATERIALS FOR ENGINEERING CIVIC ACTION PROGRAM IN INDONESIA DURING KSATRA WARRIOR | $147.1K | Aug 2, 2026 |
Top vendors in this category: Department of Defense, NAICS 238120, since Oct 1, 2024
60 contract awards in this NAICS over the period.
- 1. CDM CONSTRUCTORS INC.$7.0M
- 2. ROCKVILLE FUEL & FEED COMPANY, INCORPORATED$4.3M
- 3. SOUTHEASTERN INDUSTRIAL CONSTRUCTION, LLC$3.3M
- 4. AREAKA TRADING & LOGISTICS COMPANY$1.6M
- 5. SINGHATHAI SUPPLY COMPANY LIMITED$935.8K
Source: USAspending.gov federal award data (U.S. federal public data). A contract is called the incumbent only when the notice or its documents cite it by number.
Verify important details
Document checkConfirm submission instructions and amendments with the issuing agency before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score