Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

This RFP has expired (deadline Nov 5, 2026). Submissions are no longer accepted. The listing stays here for reference for a few weeks. Browse live RFPs or see open Construction RFPs.
Expired

Engineering Services for New Union Ditch Concrete Channel Conversion and Headgate

Buyer
City of Thornton
Place of performance
Thornton, Colorado
Response deadline
Nov 5, 2026Deletes on Nov 19, 2026
0 of 5 free RFP views today

What the buyer needs

AI summary

The City of Thornton, Colorado needs a consultant to provide professional engineering services to replace an existing headgate and implement automated flow control. The requested scope includes evaluating the existing ditch structure, designing structural supports, and developing electrical, instrumentation, and control components for a solar-powered actuator tied to a downstream Parshall flume flow meter. Additionally, the consultant must prepare complete design documents covering civil, structural, mechanical, electrical, instrumentation, and controls components for a one-year contract term. Eligible applicants are limited to onshore USA vendors, and the performance of work must be onsite. Interested vendors must attend a mandatory pre-bid conference on October 13, 2026, and submit any questions by October 26, 2026. Applicants must submit a proposal digitally via email or online, though the text does not state a final submission deadline or evaluation criteria.

Scope of work

  • Survey, design, and produce 100% construction drawings and specifications for an automated headgate system.
  • Convert 3,100-linear feet of existing concrete channel to a buried pipe conveyance system within New Union Ditch.
  • Evaluate existing ditch structure, channel conditions, and design required structural supports and anchorage.
  • Design electrical, instrumentation, and control components for automated gate operation including solar power supply and flume integration.
  • Prepare estimates of probable construction cost across pre-design, preliminary, and final design phases.
  • Provide bidding phase contract administration services.
  • Provide construction phase contract administration and periodic field observation services.

How proposals are evaluated

CriterionWeight / scoring
Responsiveness and compliance with RFP requirements including completion timelineNot specified
Past performance for Thornton and other owners and reference checks resultsNot specified
Experience dealing with municipal or other governmental agenciesNot specified
Engagement team experience and resumes of key personnelNot specified
Fee structure based on Services to be providedNot specified

Minimum qualifications

  • Must have successfully completed three projects in Colorado of similar complexity and cost within the past three years.
  • Must have a minimum of one staff member with a Professional Engineer designation assigned to the Project.

Documents to include with your response

  • Exhibit 1 Acceptance of Conditions Statement
  • Exhibit 2 Professional Service Agreement
  • Exhibit B Consultant Personnel and Subconsultants Listing
  • Exhibit C Schedule of Charges
  • Exhibit 3 Reference Authorization and Release Form
  • Acknowledged RFP Addenda

How to submit

Method
Electronic via BidnetDirect.com portal, or sealed physical hard copy by mail, courier, or hand delivery
Instructions
Physical proposals must be delivered in a sealed envelope marked with firm name, address, and project title to Contract Administration Office, 9500 Civic Center Drive, 2nd Floor City Hall, Thornton, CO 80229-4326.