Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

This RFP has expired (deadline Nov 19, 2026). Submissions are no longer accepted. The listing stays here for reference for a few weeks. Browse live RFPs or see open Professional Services RFPs.
ExpiredSolicitation 27-017AG

Electric Utility Battery Energy Storage System Feasibility Study Service

Buyer
City of Corona
Place of performance
Corona, CA (Onsite)
Response deadline
Nov 19, 2026Deletes on Dec 3, 2026
0 of 5 free RFP views today

What the buyer needs

AI summary

The government authority in Corona, California, requires a feasibility study service for an electric utility battery energy storage system. This study will evaluate the technical, operational, regulatory, and economic viability of deploying battery energy storage systems; Recommendations will be provided to support the agency's decision-making process.

The vendor will conduct a kick-off meeting, bi-weekly progress meetings, and analyze load profiles, peak demand, and load growth impacts. An energy market analysis will be performed to identify economic benefits of charging and discharging battery energy storage systems.

The study will identify interconnection, regulatory, permitting, and market participation requirements. A cost analysis for each battery energy storage system deployment alternative will also be performed, including associated equipment, engineering, site preparation, and operational costs.

All questions must be submitted no later than October 22, 2026. A mandatory pre-bid meeting will be held on October 15, 2026.

Scope of work

  • Conduct a comprehensive feasibility study evaluating technical, operational, regulatory, and economic viability of BESS deployment
  • Provide data request list and conduct kick-off and bi-weekly meetings with agency staff
  • Analyze daily and seasonal load profiles, peak demand, and forecasted load growth
  • Perform energy market analysis to evaluate energy cost exposure and BESS economic benefits
  • Identify interconnection, regulatory, permitting, and market participation requirements
  • Perform cost analysis for each BESS deployment alternative
  • Optional: Prepare an implementation plan for selected BESS alternative at WDAT locations