Acoustic and Vibration Monitoring System in Nashville, Tennessee

Buyer
Nashville, TN.
Place of performance
James K. Polk Building, 505 Deadrick Street, Nashville, Tennessee 37243
Submission deadline
Nov 30, 2026

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The government authority requires an acoustic and vibration monitoring system capable of detecting and pinpointing anomalous vibrations or acoustic anomalies within a five-foot radius of sensors. The system must operate independently of the State's network, using a broadband device like a cellular modem to relay information to offsite storage.

A minimum sixty-month warranty is required for installation, materials, and equipment service life. The system must provide continuous data collection and report unusual events.

The contract period will be three years. All questions must be submitted no later than October 22, 2026, and a pre-bid conference will be held on October 16, 2026.

Scope of work

  • Provide, assemble, deploy, test, and maintain a continuous vibration and/or acoustic monitoring system
  • Install sensors, mounting hardware, wiring, and cellular modem broadband devices for offsite data relay
  • Provide continuous data collection and report unusual events within 5 minutes
  • Provide personnel on site to monitor equipment installation, setup, and initial testing
  • Submit manufacturer data, shop drawings, sample reports, and operation and maintenance manuals
  • Provide a minimum 60-month warranty on installation, materials, equipment service life, and data collection fees
  • Perform field quality control, continuity testing, short circuit checks, and acceptance testing
  • Provide weekly activity reports and deliver software updates or hardware repairs for critical bugs within 15 days

Documents to include with your response

  • Manufacturer data for anchors, electrical boxes, associated wiring, and equipment
  • Shop drawings for the Monitoring System
  • Sample reports demonstrating report presentation
  • Operational and maintenance manual
  • Acceptance testing results