FreeFree RFPs on Craxy AI — no subscription required

Ready to bid on this RFP?

Sign up free to generate a complete proposal draft instantly — Craxy AI reads the RFP, drafts every section, and matches your past work.

Airport Master Planning Services

Golden, ColoradoColorado, USADue Tuesday, November 10, 2026
Client
Golden, Colorado
RFP Number
EXTRA-77623
Posted
10/7/2026
Category
Professional, Consulting, Administrative or Management Support Services
Budget
Looking for Proposals
NAICS
—
Set-aside
—
Contact
—

Description

AI Generated

Jefferson County, Colorado, seeks airport master planning and on-call planning services for an offsite contract performing work in Golden, CO. Requested services include airport data collection, land surveys, GIS analysis, master planning, roadway and parking assessments, development reviews, compatible land-use planning, and assistance with land release requests. Eligibility is limited to onshore US organizations, while vendors who helped draft the solicitation specifications are excluded from bidding. The county plans to award a four-year contract starting January 1, 2027, with a single one-year renewal option. Applicants must submit questions via email to Christine Perry by October 19, 2026, at 5:00 PM. Final proposals are due by November 10, 2026, at 2:00 PM and must be uploaded digitally through BidNet. The county evaluates proposals based on qualifications, price, past performance, and overall advantage to the county.

Key solicitation details

AI-extracted from Final 10052026 26-9213CP-RMMA_QBS .docx. Confirm against the original documents before bidding.

Jefferson County, Colorado, is accepting responses for Airport Master Plan and On-Call Planning Services for the Rocky Mountain Metropolitan Airport. The primary focus is the development of a new Master Plan commencing in 2027, along with various on-call planning and environmental consulting services. Qualified firms with experience in airport planning and environmental services are invited to submit qualifications.

Issued by
Jefferson County, Colorado
Solicitation Issued
October 6, 2026.
Questions DUE
October 19, 2026 @ 5 pm.
Addendum posted
Estimated October 23, 2026
DUE DATE
November 10, 2026 @ 2 pm.
Contract Performance Period
January 1, 2027.
How to submit
Electronic via BidNet (Rocky Mountain E-Purchasing System)
Submission details
One electronic copy submitted online via BidNet at www.bidnetdirect.com/colorado. Hard copies or submissions via other methods are not accepted.
Contract term
Four-year contract, with a single one-year renewal option
Place of performance
Rocky Mountain Metropolitan Airport, Jefferson County, Colorado
Insurance and bonding
Certificates of insurance naming Jefferson County, Colorado as Certificate Holder and Additional Insured. Insurer must be licensed in Colorado with AM Best rating of at least A- and/or VII.
Funding
Jefferson County Funds and/or Federal Funds (FAA AIP, 2 CFR Part 200 Appendix II)

How proposals are evaluated

Key personnel’s professional qualifications, experience and availability25 points
Capability to perform all or most aspects of the proposed services, including recent experience with comparable airport plans and studies25 points
Demonstrated ability to complete projects on time and without major cost escalations or overruns10 points
Knowledge of FAA regulations, policies, and procedures, as well as their relationship with local plans and ordinances10 points
Demonstrated experience with communication plans and engagement programs10 points
Demonstrated ability of key staff to be available for in-person meetings, site visits, and timely response to County requests10 points
Familiarity and degree of interest in addressing RMMA’s specific opportunities and challenges10 points

Scope of work

  • Development of a new Airport Master Plan
  • Airport data collection and facility inventories
  • Land surveys, GIS data collection and analysis
  • Assistance with FAA land release requests
  • Updating of Airport Layout Plan and Airport Property Map
  • Airport development master planning, conceptual planning, layout and infrastructure planning
  • Roadway planning, parking assessments, and transportation forecasting
  • Environmental studies including NEPA Categorical Exclusions and Environmental Assessments

Minimum qualifications

  • Must be organized for providing airport planning and environmental services with at least five years previous experience
  • Must be prepared to meet specified insurance requirements
  • Proven FAA-funded project experience, master plan experience specifically, or demonstrated familiarity with AIP grant process

Documents to include with the bid

  • Completed and signed Company Submission Document
  • Project data for Airport Planning and Environmental Projects in the last three years
  • Resumes and references for key personnel
  • Active Unique Entity Identification (UEI) Number

Verify important details

Document check

Confirm submission instructions and amendments with the issuing agency before responding.

4 available filesDocuments checked

Personalized fit score

Sign up free to see how well this opportunity fits your company — based on your saved profile.

Sign up to see your fit score