ExpiredSolicitation 25-065

Float Electrification Service in San Francisco, California

Buyer
Water Emergency Transportation Authority
Place of performance
Treasure Island Ferry Terminal, San Francisco, CA
Response deadline
Nov 9, 2026Deletes on Nov 23, 2026
0 of 5 free RFP views today

What the buyer needs

AI summary

The government authority requires float electrification service in San Francisco, California. This includes structural steel work, fabrication and installation of an aluminum walkway, and increased electrical power distribution capacity.

The project also involves installing power conversion equipment and dispensers for electric ferry charging, along with a hydraulic mooring line tensioning system. A pre-bid conference is scheduled for October 15, 2026.

All questions regarding this solicitation must be submitted no later than October 22, 2026. The deadline for submissions is November 9, 2026.

Scope of work

  • Structural steel work to the floating dock
  • Fabrication and installation of a new aluminum walkway
  • Increased electrical power distribution capacity
  • Installation of power conversion equipment
  • Installation of dispensers for electric ferry charging
  • Hydraulic mooring line tensioning system installation
  • Lighting and access platforms installation
  • Potable water system modifications

Minimum qualifications

  • AWS D1.1/D1.1M qualified welders, welding operators, and tackers
  • AWS-certified welding inspectors
  • Professional engineer qualifications for stamping drawings, reports, or deliverables
  • Certificates, licenses, and letters of compliance required by the City of San Francisco and regulatory bodies

Documents to include with your response

  • Fabrication shop quality certification
  • Professional engineer qualification data
  • Builder's Weight Estimate
  • Ballast Plan
  • Deliverable Schedule
  • Fabrication drawings
  • System start-up checklist
  • Condition survey report
  • Certificates of compliance for materials