What the buyer needs
AI summaryThe government authority in Stockton, California, requires customer side design and engineering services. This includes electrical engineering design, technical documentation, construction support, and coordination for sustainability, electrification, and energy resilience initiatives.
Services needed encompass solar photovoltaic system engineering, electric vehicle charging infrastructure engineering, battery energy storage system engineering, and mobile harbor crane power infrastructure.
A mandatory in-person pre-proposal conference and site visit are scheduled for October 21, 2026. All questions must be submitted by October 29, 2026; The contract period will be for three years.
Scope of work
- Solar Photovoltaic System Engineering
- Electric Vehicle Charging Infrastructure Engineering for 46 charging stations
- Battery Energy Storage System Engineering for 0.5 MWh and 1 MWh capacity
- Mobile Harbor Crane Power Infrastructure for two cranes at 4,000 volt service
- California Title 24 Energy Code Compliance calculations and documentation
- Preparation of electrical engineering design drawings, specifications, and calculations
- Utility coordination and support for permitting reviews
- Project management, status reporting, and risk register maintenance
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Qualifications | 20 |
| Experience | 20 |
| Project Approach | 20 |
| Cost Proposal | 35 |
| Overall proposal organization | 5 |
| Active TWIC for project team members (additional points) | 5 |
Minimum qualifications
- Continuously engaged in the proposed services for a minimum of the past five (5) years
- Completion of related services for at least two public agencies and one additional public or private entity in the last five years
- Valid business license issued by the City of Stockton upon contract start date
- Not subject to debarment or suspension from Federal procurement and non-procurement programs
- Valid Transportation Worker Identification Credential (TWIC) for personnel accessing restricted sites once under contract
- Exclusion of third parties that assisted in drafting solicitation documents
Documents to include with your response
- Executive Summary
- Project Team Description, Résumés, and Organizational Chart
- Appendix A: Respondent Questionnaire
- Modifications to Standard Agreement & Minimum Insurance Requirements (or statement of no modifications)
- Preliminary Evidence of Insurance
- Appendix C: Federal Disclosures and Submission Forms
- Cost Proposal and Rate Sheet(s) (in separate sealed envelope)
How to submit
- Method
- Sealed hard copy and flash drive in person or by mail
- Instructions
- Submit four (4) complete double-sided hard copies and a flash drive with PDF proposal and Word contract modifications. Cost Proposal and Rate Sheet must be in a separate sealed envelope. Submit to Stockton Port District Finance Department, 315 Fyffe Avenue, Stockton, CA 95203, Attn: Janice Dias, Procurement Officer.