What the buyer needs
AI summaryThe government authority located in Minnesota requires a US-based vendor to provide industrial implementation program services on an as-needed basis. The selected vendor must perform all requested scope of work onsite at the authority's location.
Only onshore US organizations are eligible to submit proposals for this opportunity. The buyer seeks proposals to determine the budget, but the provided text does not state the contract term, submission deadlines, application requirements, or evaluation criteria.
Scope of work
- Advanced air conditioning and low global warming potential refrigerants
- Boiler upgrades, economizers, condensate return, or steam traps
- Distributed energy resources such as solar, battery storage, or power generation
- Electrification of equipment including roasters, boilers, dryers, and ovens
- High-efficiency electric pumps, motors, compressors, and lighting
- Fuel-switching to low carbon fuels such as biomass and solar-thermal
- Industrial heat pumps and smart energy management systems
- Process efficiency or process changes to reduce energy demand and waste
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Technical assistance and planning (TAP) grant recipient status | Not specified |
| Shovel readiness and supporting engineering documentation | Not specified |
| Permitting and approvals plan | Not specified |
| Contractor selection and qualifications | Not specified |
| Project budget and cost realism | Not specified |
| State benefit points based on annual GHG reduction cost effectiveness | Not specified |
Minimum qualifications
- Facility must be located within Minnesota boundaries or serve Minnesota, including Tribal lands
- Must be an eligible food and beverage manufacturer or food system organic waste processor
- Must not be suspended or debarred by the State of Minnesota or the federal government
- Must obtain a active federal Unique Entity Identifier (UEI) in SAM.gov before grant award
- Must provide at least 40% matching funds for total eligible project costs
Documents to include with your response
- Grant application form
- Required exhibits
- Budget template with itemized quotes
- Baseline energy assessment or greenhouse gas emissions inventory
- Engineering designs or specifications for shovel readiness
How to submit
- Method
- Electronic via the SWIFT Supplier Portal
- Instructions
- Submit the grant application form, required exhibits, and budget template through the SWIFT Supplier Portal.
