What the buyer needs
AI summaryThe solicitation is for a Cimplicity software upgrade from version 11.1 to the final production release of Cimplicity 2026. The vendor will assess, design, implement, test, document, and support this upgrade while protecting continuous wastewater operations.
The upgrade must modernize the system architecture, preserving validated screens, points, alarms, scripts, data logging, device communications, and third-party integrations. Continuous monitoring and control will be maintained through parallel systems, redundancy, pretesting, and documented rollback procedures.
The vendor must provide difference sessions for operators and administrators, detailing changes between the old and new environments. Complete as-built documentation, test evidence, and knowledge transfer are required to enable Resource Renew staff to maintain the upgraded system.
All questions regarding this solicitation must be submitted no later than October 23, 2026. The submission deadline for the upgrade project is November 20, 2026.
Scope of work
- Upgrade existing CIMPLICITY architecture from version 11.1 to the production release of CIMPLICITY 2026.
- Maintain continuous monitoring and control using parallel systems, redundancy, pretesting, controlled cutover, and rollback procedures.
- Modernize system architecture while preserving screens, points, alarms, scripts, data logging, device communications, and third-party integrations.
- Improve OT network segmentation using the Purdue Model and NIST SP 800-82 Revision 3 safeguards.
- Implement Proficy Authentication with Microsoft Active Directory Domain Services.
- Provide differences sessions for operators, SCADA administrators, and MIS staff.
- Provide complete as-built documentation, test evidence, knowledge transfer, and a minimum 30-calendar-day stabilization support.
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Technical Approach, SOW, and Implementation Strategy | Not specified |
| Qualifications, Experience, and References | Not specified |
| Cost and Total Cost of Ownership | Not specified |
Minimum qualifications
- Onshore (USA Organization Only)
Documents to include with your response
- Minimal Downtime Acknowledgment
- Change Order Acknowledgment
- Completed Proposal Form Part A Cost and Schedule
- Completed Proposal Form Part B Qualifications and References
- Completed Proposal Form Part C Certification
- Detailed Statement of Work and task-level labor and cost breakdown
How to submit
- Method
- Electronic or mail
- Instructions
- Submit 1 searchable PDF by email to [email protected] or mail to 2626 Courtland St., Duluth, MN 55806, clearly marked GE CIMPLICITY Software Upgrade – RFP #1519.