What the buyer needs
AI summaryThe buyer is soliciting shelter art fabrication services. This includes design review and coordination, fabrication of elements, site preparation, installation, and post-installation cleanup.
Fabrication requires providing samples and mock-ups for approval before full production, confirming dimensions, and using approved materials. Site preparation involves inspecting and preparing the installation area, including surfaces and waterproofing.
Installation must follow the approved design and quality assurance plans, ensuring proper alignment and adhesion. Post-installation includes cleaning the area and disposing of debris according to local regulations.
A pre-bid conference will be held on December 2, 2026, with all questions due by December 7, 2026. The contract period will be for one year.
