What the buyer needs
AI summaryThe government authority requires irrigation improvements and well decommissioning services in Richland, Washington. Work includes utility connections, a new water meter assembly, irrigation tie-in, electrical isolation, and well closure.
The project involves surveying, easement documentation, turf restoration, testing, and coordination. All work shown on contract drawings or reasonably necessary for completion is included.
Before excavation, verify all existing conditions, dimensions, depths, buried utilities, and connection points. Arrange public and private utility locates at least two business days before excavation.
Protect existing buildings, pavement, walks, trees, landscaping, utilities, and irrigation piping. Repair any damage at the contractor's expense; The contract period will be for one year.