Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

Open

Construction Manager at Risk Services in Jackson, Wyoming — Jackson Hole Airport

Buyer
Buyer not provided
Place of performance
Jackson, Wyoming
Submission deadline
Dec 11, 2026

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The government authority requires construction manager at risk services in Jackson, Wyoming. This includes demolition and decommissioning of existing units, and installation of three new machines in a 2+1 configuration.

The project involves constructing a 20,000-square-foot tensile structure with a covered conveyor connection. It also includes building expansion and renovation for various support spaces and systems.

Services include removal, relocation, modification, salvage, and replacement of associated conveyors, controls, and infrastructure. Manual reinsert capability and a power-driven lift table are also required.

All questions regarding this solicitation were due by November 24, 2026, and a pre-bid meeting was held on November 16, 2026.

Scope of work

  • Demolition and decommissioning of outbound and reveal-series units
  • Relocation, modification, salvage, and replacement of conveyors, controls, and infrastructure
  • Installation and integration of three machines in a 2+1 configuration
  • Provision of manual reinsert capability for non-cleared baggage
  • Construction of a 20,000-square-foot tensile structure and covered conveyor connection
  • Building expansion and renovation for make-up device, control and server spaces
  • Architectural, structural, mechanical, plumbing, electrical, fire protection, low-voltage, security, and site work