What the buyer needs
AI summaryEnvironment and Climate Change Canada (ECCC) requires the fabrication of a hot-dip galvanized steel grated platform and associated components for a replacement stilling well at the Pointe-des-Cascades Hydrometric Station (02MC005) in Québec. The work aims to improve water level monitoring accuracy on the St. Lawrence River. Mandatory deliverables include a preliminary site visit and the fabrication and supply of the steel platform components, reviewed by a qualified Professional Engineer. Optional deliverables include site preparation, installation, decommissioning, and asbestos abatement. The contractor must complete the fabrication by March 31, 2027. If optional work is exercised via amendment, the project completion deadline is November 15, 2027.