Mine Creek Sanitary Sewer Improvements

Buyer
City of Raleigh
Place of performance
Raleigh, NC (Mine Creek, Shelley Lake Dam, Shelley Lake Auxiliary Spillway)
Submission deadline
Jan 14, 20272:00 PM EST

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The City of Raleigh seeks bids for Mine Creek Sanitary Sewer Improvements. This project involves installing approximately 15,500 linear feet of 24, 36, and 42-inch gravity sewer and associated manholes; It also includes installing approximately 13,000 linear feet of CIPP structural liner in existing 24, 30, and 36-inch gravity sewer and epoxy lining of existing manholes.

Additional work includes trenchless installation of 36-inch gravity sewer through the Shelley Lake Auxiliary Spillway and abandonment of the existing 24-inch gravity sewer through Shelley Lake Dam. The project also requires installation of two pre-cast junction structures and approximately 1,720 linear feet of stream stabilization measures.

The project scope further encompasses removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. Sealed bids will be received until 2:00 PM on January 14, 2027.

A mandatory pre-bid meeting is scheduled for December 8, 2026, at 2:00 PM at 944 W Millbrook Rd, Raleigh, NC 27612. Bids must be accompanied by a five percent bid security; Award will be made to the lowest responsible and responsive bidder.

Scope of work

  • Installation of approximately 15,500 LF of replacement 24-inch, 36-inch, and 42-inch gravity sewer and associated manholes
  • Installation of approximately 13,000 LF of CIPP structural liner in existing 24-inch, 30-inch, and 36-inch gravity sewer
  • Epoxy lining of associated existing manholes
  • Trenchless installation of 36-inch gravity sewer through the Shelley Lake Auxiliary Spillway
  • Abandonment of the existing 24-inch gravity sewer through Shelley Lake Dam
  • Installation of two pre-cast junction structures to maintain adequate flow splits
  • Installation of approximately 1,720 LF of stream stabilization measures
  • Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements

How proposals are evaluated

CriterionWeight / scoring
Lowest responsible and responsive Bidder (quality, performance, and time specified in the Bid Form)Not specified

Minimum qualifications

  • Must be one of the previously Prequalified General Contractors listed in the Advertisement for Bids
  • Must select from the previously Prequalified Microtunneling Subcontractors listed to perform microtunneling work
  • Licensed to perform the work as required by North Carolina General Statute, Chapter 87 and the Instruction to Bidders

Documents to include with your response

  • Bid Proposal Form / Bid Form
  • Bid Security in the amount of five percent (5%) of the Bid
  • Evidence of North Carolina contractor's license

How to submit

Method
Sealed Bids
Instructions
Received at One Exchange Plaza, Conference Room 1 (6th floor), Raleigh, NC 27601, where bids will be publicly opened and read aloud.