What the buyer needs
AI summaryThe Federal Aviation Administration is seeking proposals for the construction of Industrial Wastewater Treatment Plant Upgrades at the Mike Monroney Aeronautical Center. This procurement is a total small business set-aside with an estimated price range between $10,000,000 and $20,000,000. A mandatory pre-proposal conference and site visit will be held on Monday, November 2, 2026, at 10:00 a.m. Central Time at the Mike Monroney Aeronautical Center. Attendance is required for proposal consideration. Interested parties must confirm their intent to attend the pre-proposal conference in writing by Friday, October 30th, 2026, at 12:00 p.m. Central Time.
Incumbent and award research
Likely prior awards for this requirement
Likely matchAwarded by the same buying office (6973GH) with descriptions matching "mike monroney", performed in OK. The notice does not name its current contract, so confirm before relying on it.
| Vendor and award | Value | Ends |
|---|---|---|
| AIRGAS USA, LLC6973GH25F00593 · THE CONTRACTOR MUST PROVIDE AND MAINTAIN AND/OR REPLACE THE CONTRACT PROVIDED (MICROBULK) | $10,869 | Jun 30, 2029 |
| CHICKASAW STRATEGIC POINTE, LLC6973GH26F01162 · F&E AES LAB DESIGN AT MIKE MONRONEY AERONAUTICAL CENTER IN OKLAHOMA CITY, OK (OEX) MMAC JC | $48,380 | Sep 30, 2027 |
| STRONGBOW STRATEGIES LLC6973GH25F00573 · MIKE MONRONEY AERONAUTICAL CENTER (MMAC) ADMIN SUPPORT SERVICES FOR FACILITIES MANAGEMENT | $138.9K | Mar 3, 2026 |
| STRONGBOW STRATEGIES LLC6973GH25F00531 · MIKE MONRONEY AERONAUTICAL CENTER (MMAC) ADMIN SUPPORT SERVICES - CY2 ORDER | $213.3K | Mar 3, 2026 |
| ATT MOBILITY LLC6973GH21P05996 · PURCHASE OF 2 FIRSTNET COMPACT RAPID DEPLOYABLE (CRD) FOR THE MIKE MONRONEY AERONAUTICAL C | $140.0K | Sep 30, 2021 |
Market context
Awards in the same category (Water and Sewer Line and Related Structures Construction). This is not this requirement's award history.
Recent similar awards: Department of Transportation, NAICS 237110
| Vendor and award | Value | Ends |
|---|---|---|
| IDEAL ENGINEERING SOLUTIONS P.S.C697DCK25C00241 · REPLACE EXISTING UNDERGROUND UTILITIES ON PROPERTY INCLUDING DOMESTIC WATER, FIRE WATER, F | $7.7M | Nov 23, 2027 |
| CMP COMMERCIAL CONSTRUCTION INC697DCK23C00356 · BIL-FUNDED. REPLACE UNDERGROUND SITE UTILITIES AND PARKING LOT REFURBISHMENT AT KANSAS CIT | $14.2M | Nov 15, 2027 |
| THE PLUMBING SHOP, INC697DCK25C00038 · THE JACKSONVILLE ARTCC CURRENTLY HAS A REQUIREMENT TO REPLACE THE SEWAGE/ STORM LIFT STATI | $808.9K | May 31, 2027 |
| CEDARVILLE ENGINEERING GROUP LLC69727626C000001 · POTABLE WATER WELL SYSTEM - GRANULAR ACTIVATED CARBON SYSTEM FOR REMOVAL OF TOTAL ORGANIC | $405.6K | Apr 11, 2027 |
| CITY OF OCEAN SPRINGS693C7326M000002 · SERVICES FOR THE CITY OF OCEAN SPRINGS TO PROVIDE MATERIAL, EQUIPMENT, LABOR, AND CONSTRUC | $224.3K | Feb 28, 2027 |
Top vendors in this category: Department of Transportation, NAICS 237110, since Oct 1, 2024
28 contract awards in this NAICS over the period.
- 1. IDEAL ENGINEERING SOLUTIONS P.S.C$7.7M
- 2. SHEEHY CONSTRUCTION CO$6.9M
- 3. AHTNA INFRASTRUCTURE & TECHNOLOGIES LLC$1.8M
- 4. CMP COMMERCIAL CONSTRUCTION INC$1.5M
- 5. CONSTRUCTION SOLUTIONS GROUP, LLC$1.0M
Source: USAspending.gov federal award data (U.S. federal public data). A contract is called the incumbent only when the notice or its documents cite it by number.
