What the buyer needs
AI summaryThe solicitation is for the demolition and reconstruction of a northwest breakwater wharf in St. Bride’s, NL. This includes furnishing all labor, plant, equipment, and material necessary for the project. Key deliverables include constructing a new treated timber crib wharf with a reinforced concrete deck, and installing mooring cleats, fenders, and ladders. Electrical upgrades to Structure #408 are also part of the scope. Bidders must submit a Health and Safety Plan within 10 work days of contract award. All work shall be completed by March 31, 2030.
Scope of work
- Demolition and removal of the existing northwest breakwater wharf
- Disposal of creosote timber at a provincially regulated waste disposal site
- Construction of a new treated timber crib wharf with reinforced concrete deck and spraywall
- Filling seaward side crib bays of the outer headblock section with concrete
- Supply and installation of mooring cleats, structural timber coping, wheelguard, fenders, and ladders
- Electrical work for the northwest breakwater wharf, including a new electrical shed
- Electrical upgrades to Structure 408, including new shed, pedestals, wiring, trenching, and HDPE culvert
Minimum qualifications
- Dive personnel must meet minimum competency requirements of CSA Z275.4-02 (R2008)
- Qualified journeymen shall be engaged in painting
- Master Electrical contractor license as required
- Qualified trades people shall be used for the project