What the buyer needs
AI summaryPlans, specifications, and contract documents are available from Parker Engineering, LLC for $100.00. Bids must include a bid bond or cashier's check of at least 10% of the base bid.
Scope of work
- Bituminous tack coat
- Patching
- Edgeline milling
- Asphalt overlay
- Striping for 4.06 LM across designated streets (Church Drive, Henry Street, Holly Street, Liberty Street, Howard Street, Marietta Street, Dasher Road, Auburn Road, Bull Street, and Christy Street)
Minimum qualifications
- Compliance with E-Verify regulations
- Surety company licensed in Georgia with an A minimum rating and financial strength of at least 5 times contract price listed in Best Key Rating Guide
Documents to include with your response
- Bid bond or certified cashier's check (not less than 10% of base bid)
- Performance Bond (100% of contract price)
- Payment Bond (100% of contract price)
- Power of Attorney for bonds
How to submit
- Method
- Sealed bids
- Instructions
- Received until November 24th, 2026 at 2:00 PM at Glennville City Hall, 134 S. Veterans Boulevard, Glennville, Georgia 30427.
