What the buyer needs
AI summaryThe City of Worcester seeks a contractor to replace the direct expansion air handling unit at Sullivan Middle School in accordance with the attached plans and specifications. The Division 23 heating, ventilation, and air-conditioning scope includes air handling unit sequences, airflow measuring stations, variable-speed fan drives, and fire alarm interlocks. The selected contractor must also coordinate permits, record drawings, and operation and maintenance data, while supplying floating reinforced concrete inertia bases, steel supports, and vibration isolation and seismic restraint systems. The automatic temperature control contractor must implement all required controls, monitored points, and alarmed points. The City of Worcester estimates the total project cost at $125,000.00. Interested bidders can attend a pre-bid meeting scheduled for November 24, 2026.
Scope of work
- Replacement of DX AHU (direct expansion air handling unit) at Sullivan Middle School
- Packaged roof top air-conditioning units and air handling unit installation
- Automatic temperature controls and Facilities Management System (FMS) integration
- Vibration isolation, supports, and seismic restraint systems
- Ductwork insulation, hangers, supports, and mechanical identification
- Testing, adjusting, balancing, and air duct and system cleaning
- Electrical disconnect switches, circuit breakers, raceways, wiring, and connections
- Selective demolition, cutting, patching, and core drilling
