What the buyer needs
AI summaryNorth Carolina Central University seeks a Construction Manager at Risk for HVAC and BAS repairs at the Mary Townes and BRITE Complex. This is Phase 1 of a multi-phase project. Phase 1 includes chiller and heating hot water plant replacement, and HVAC and controls replacement for the BRITE Lab. Electrical, fire protection, structural, and architectural scopes are also included. The CM shall provide performance and payment bonds executed by a surety company authorized to do business in North Carolina. The bonds shall be in the full contract amount.
Scope of work
- Chiller plant replacement
- Heating hot water plant replacement
- BRITE lab exhaust fans replacement
- BRITE AHU-5 and 6 replacement
- BRITE controls and terminal unit replacement
- Electrical power system modifications and AHU duct detectors
- Fire protection system modifications for new BRITE chiller plant
- Structural cooler tower framing and architectural roof modifications
Minimum qualifications
- Experience collaborating with Design Team during the design phase
- Experience renovating occupied institutional and higher education campus facilities
- Delivering projects to Final Acceptance by the AHJ on-schedule
- Coordinating work within active environments
- Delivering large scale renovation projects involving existing building systems
- Employ an engineer or land surveyor licensed in North Carolina
Documents to include with your response
- Qualifications Questionnaire
- Non-Collusion and Non-Suspension Statement
- Performance Bond and Payment Bond (upon contract execution)
- Evidence of insurance (upon contract execution)
How to submit
- Method
- Electronic via email
- Instructions
- Only electronic proposals in PDF format will be accepted via email to the Capital Projects Manager. Submit one proposal for each advertisement.
