What the buyer needs
AI summaryThe project involves installing two submersible wastewater pumps in the existing wet well, along with a control panel and generator. This includes a 12-inch station piping, valves, and a bypass connection.
The work also includes connecting to the existing 16-inch force main and completing all necessary site work and fencing. All labor and products must meet project specifications and construction drawings.
