What the buyer needs
AI summaryWestern Carolina University seeks engineering design services for repairs and improvements to the Cullowhee Dam. The project includes addressing foundation undercuts, replacing a damaged sidewall, and overlaying existing timber flashboards with concrete; Existing cracks and joints will also be repaired.
The dam is a 7-foot tall, 160-foot-long concrete structure on the Tuckasegee River, originally built in 1930. The estimated project budget is $1,503,960.
Proposers must be licensed in North Carolina to offer architectural or engineering services. Letters of Interest and current SF-330 forms should be submitted to Joe Walker, PE, at Western Carolina University's Office of Facilities Management.
The closing date for submissions is January 13, 2027. The project manager is Joe Walker, PE.
Scope of work
- Engineering design for dam repairs and improvements
- Repair undercut in structure foundation
- Replace damaged right sidewall
- Replace existing timber flashboards with a concrete overlay
- Repair existing cracks or joints
Minimum qualifications
- Licensed in the State of North Carolina
Documents to include with your response
- Current SF-330
How to submit
- Method
- Letters of Interest and Current SF-330
- Instructions
- Submit to Joe Walker, PE, Western Carolina University, Office of Facilities Management, 3476 Old Cullowhee Road, Cullowhee, NC 28723
