What the buyer needs
AI summaryContractors must provide a Bid Bond of at least ten percent of the bid amount. The successful bidder will need to furnish a Performance Bond and Payment Bond, each for one hundred percent of the contract amount.
Scope of work
- Furnishing labor, materials, and equipment to construct the 2026 Water Meter Change Out project
- Changing out approximately 4,700 water meters and accessories
- Installation of new water meter reading system equipment and hardware for Division A
- Installation of tower base stations, antennas, and repeaters
- Installation of class 3 wood poles (80 ft length) with grounding
- Supply and installation of water meters, jumbo meter boxes, plastic lids, and backflow preventers for Division B
- Execution of work in phases starting with the Haddock system (approx. 350 meters) then River North Subdivision (approx. 600 meters)
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Total Base Bid amount | Not specified |
Minimum qualifications
- Licensed by the State of Georgia
- Fully insured and bonded
- License number written on the face of the bid envelope
- Minimum 3 qualifying projects with not fewer than 5,000-meter installations
- Minimum 1 qualifying project with not fewer than 15,000-meter installations
Documents to include with your response
- Bid Form
- Bid Bond
- Contractor License Number on bid envelope
- Bid Data indicating standard specifications, details, or drawings with any deviations
How to submit
- Method
- Sealed Bids
- Instructions
- Submit sealed bids to Jones County Board of Commissioners, 166 Industrial Blvd., Gray, GA 31032, ATTN: Ms. Leslie Faulk or Mr. Jason Rizner. Contractor license numbers must be written on the face of the bid envelope.