Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

OpenSolicitation CLMC1105

Construction of Distribution Getaway Duct Bank Bore and Manholes at East Village Substation

Buyer
City of Austin
Place of performance
4605 1/2 E. Howard Lane next to the East Village Substation, Austin, TX
Submission deadline
Dec 3, 20263:00 PM EST

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The City of Austin, through Austin Energy, seeks a contractor to construct a distribution getaway duct bank bore at the East Village Substation under solicitation CLMC1105. The contractor must furnish all tools, labor, materials, equipment, and miscellaneous items for the work, while Austin Energy will install the conductors upon project completion. The scope includes approximately 342 linear feet of 36-inch jack and bore with 12-5 inch carrier pipes grouted within the casing pipe in groundwater conditions. It also requires 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, two 12'x12' manholes, erosion and sedimentation control, and revegetation. Post-bid submittals require bidder information, general contractor and key personnel experience, technical experience, available equipment and workforce, current and completed projects, and bidder authentication. The provided text does not state submission deadlines, evaluation criteria, contract term, or budget.

Scope of work

  • Approximately 342 linear feet of 36-inch jack and bore with 12-5 inch carrier pipes
  • Grouting carrier pipes within the casing pipe in groundwater conditions
  • 386 linear feet of 12-5 inch open cut duct bank
  • 79 linear feet of 2-5 inch open cut duct bank
  • Two 12-foot by 12-foot manholes
  • Erosion and sedimentation control
  • Revegetation and site restoration

Minimum qualifications

  • Registered to do business with City of Austin prior to contract award
  • Subcontractors must be registered as vendors prior to contract execution
  • Minimum of three successfully completed comparable projects within the past ten years
  • NASSCO-PACP certified inspectors for any required storm drain video inspection

Documents to include with your response

  • Unit Price Bid Form (Section 00300U)
  • Total Bid Form
  • MBE/WBE Compliance Plan
  • Bid Guaranty
  • Statement of Bidder's Experience (Section 00400)
  • Certificate of Non-Suspension or Debarment (Section 00405)
  • Statement of Bidder's Safety Experience (Section 00410)
  • Prohibited Activities (Section 00440)
  • Non-Discrimination and Non-Retaliation Certificate (Section 00630)
  • Wage Theft Certification Form (Section 00830WT)

How to submit

Method
Electronic via Austin Finance Online eResponse
Instructions
Bids and MBE/WBE Compliance Plans must be submitted electronically via Austin Finance Online eResponse prior to the deadline. Bidders must be logged in as the primary contact.