What the buyer needs
AI summaryThe solicitation is for the construction of a wetland to treat ditch water using a solar-powered pump. The project includes selective clearing, excavation, grading, tile and outlet structures, a lift station, riprap placement, and seeding.
Key components include approximately 7,800 cubic yards of earthwork, 726 linear feet of pipe, 67 tons of rock, and 140 tons of trench stabilization material. The project also requires a modified concrete outlet structure, a two-chamber water control structure, and seeding of 4.9 acres.
Construction completion is scheduled for November 1st, 2027, with seeding by December 15th, 2027. The estimated construction cost ranges from $175,000 to $275,000.
The contractor must manage pollution control, including disposal of chemical pollutants and wastewater. Dust control measures and fire prevention are also required; Mobilization and demobilization activities and costs are included.