What the buyer needs
AI summaryThe City of Flowery Branch, Georgia, is soliciting proposals for the rehabilitation of the Portsmouth Lift Station wet well and associated discharge piping infrastructure. This project requires furnishing all labor, materials, equipment, and services for new infrastructure, including piping, valves, concrete, and epoxy.
Work includes bypass pumping, draining the force main, cleaning the station, and installing new discharge valves and piping. The interiors of the wet well, overflow manhole, and valve vault will be lined with epoxy, and all existing valves and piping will be removed and disposed of.
Proposals are due by January 26, 2027, at 1:00 p.m. EST. A mandatory pre-bid meeting is scheduled for January 5, 2027, at 9:30 a.m. EST, and questions are due by January 8, 2027, at 11:00 a.m. EST.
The City will evaluate submissions based on published criteria. The selected respondent must maintain specific insurance coverages, including Workers’ Compensation Statutory Minimum and General Liability of $1,000,000 per incident and $3,000,000 aggregate.
