What the buyer needs
AI summaryThe City of Worcester, through its Purchasing Division and Department of Public Works, seeks bids under Bid No. 8808-J7 for the replacement of the potable water booster pump skid at its Water Filtration Plant in Holden, Massachusetts. The scope includes all materials, equipment, services, and construction inherent to the work, covering concrete repair, electrical systems, piping disinfection, startup, and commissioning. The estimated cost for the project is $492,000. Addendum No. 1, released on November 4, 2026, clarifies that the minimum suction pressure is 40 psi, provides the specifications table of contents, and identifies the Syncroflo manufacturer's representative. Bidders must acknowledge and include Addendum No. 1 with their submission. The provided documents do not state eligibility requirements, submission deadlines, evaluation criteria, or the contract term.
Scope of work
- Remove and dispose of the existing potable water booster pump skid
- Clean, repair, and paint the existing concrete equipment pad
- Furnish and install a new prefabricated tri-plex potable water booster skid
- Provide internal piping, pumps, motors, valves, electrical, instrumentation, and controls
- Complete final start up, testing, commissioning, and training
Minimum qualifications
- Testing firm shall submit proof of certification by NETS
Documents to include with your response
- Acknowledgment and/or inclusion of Addendum No. 1
