Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

OpenSolicitation 27-006

Design-Build Services for State Route 280 (South Cobb Drive) Corridor Improvements

Buyer
City of Smyrna, Georgia
Place of performance
State Route 280 (South Cobb Drive) corridor in Smyrna, Georgia, from Concord Road to Windy Hill Road
Submission deadline
Mar 5, 20275:00 PM EST

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The City of Smyrna seeks a Design-Builder to provide design and construction services for the State Route 280 (South Cobb Drive) Improvements Project in Smyrna, Georgia. The 1.65-mile corridor project runs from Concord Road to Windy Hill Road and includes two through lanes and a local access lane in each direction, 12-foot shared-use paths, raised landscaped buffers, and a raised median. Additional scope includes curb and gutter, roadway lighting, storm drainage and two culvert improvements, one new traffic signal, six reconstructed traffic signals, driveway modifications, and Plaza Drive realignment. The project will follow the Georgia Department of Transportation's Design-Build process. The City of Smyrna will issue a subsequent Request for Qualifications/Proposals containing project-specific instructions, the selection method, and the point of contact for written questions. Proposers must regularly check the Georgia Procurement Registry for updates, and a Virtual Industry Forum presentation will be published on the City of Smyrna website.

Scope of work

  • 12-foot shared-use path on both sides of the roadway
  • Local access lane and two through lanes in each direction
  • Raised landscaped buffers and a raised median separating opposing traffic movements
  • Curb and gutter
  • Roadway lighting along the shared-use paths and local access lanes
  • Storm drainage enhancements including two culvert improvements
  • Installation of one new traffic signal and reconstruction of six existing traffic signals
  • Driveway modifications and the realignment of Plaza Drive