What the buyer needs
AI summaryThe National Research Council of Canada's Drone and Flight Autonomy Laboratory requires one Mobile Command Centre (MCC) for its Centre for Autonomous Flight Systems. The MCC will serve as a ground control, telemetry, safety-monitoring, and data-recording facility for flight trials.
This vehicle must support research on flight autonomy and human factors, as well as Remotely Piloted Aircraft System operations at field sites across Canada. It will replace an existing trailer that lacks sufficient capacity and features for current operational needs.
The MCC must be a purpose-built, self-contained vehicle with a 'box-over-cab' body on a Class 3 chassis, weighing at least 12,500 lbs and measuring at least 25 feet long. It requires five interior workstations, central equipment cabinets, and rear equipment space.
Proposals are due by December 8, 2026, at 2 PM EST. The contract will be awarded to the lowest-priced compliant proposal that meets all mandatory technical evaluation criteria.
Scope of work
- One purpose-built Mobile Command Centre vehicle with chassis, body, and interior fit-up
- Control cabinet, cabling, vehicle network, and satellite terminal
- Display, onboard industrial computer, time reference, video encoder, and recording systems
- Operator workstations, seating, and wireless intercom system
- Two telescopic masts, antennas, and RF distribution system
- Power, 12V DC distribution, HVAC, and interior and exterior lighting
- Design review, factory testing, documentation, importation, and certification
- On-site training for up to eight staff and warranty and in-service support program
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Technical Merit (Mandatory and Point-Rated Technical Criteria, 100-point scale) | 20% (stated as 80% in Section 9.1.b) |
| Price (Total Aggregated Cost of Fixed Price) | 80% (stated as 20% in Section 9.1.b) |
Minimum qualifications
- Comply with all mandatory technical criteria
- Chassis manufacturer certification and completed vehicle certification
- FCC certification for unlicensed devices and ISED certification or plan to obtain
Documents to include with your response
- Offer Submission Form
- Offeror Declaration Form
- Technical Proposal addressing mandatory and point-rated criteria
- Financial Offer in accordance with Basis of Payment
- Signed Officer Attestation
- Statement of importation, registration, and certification approach
How to submit
- Method
- Electronic via email
- Instructions
- Return bids to [email protected]. Offers must include a Technical Offer and a Financial Offer.
