What the buyer needs
AI summaryThe City of Marietta is soliciting bids for the Burruss Park Bridge Construction project. This project involves removing an existing culvert drain and replacing it with a 60-foot prefabricated bridge. The scope of work includes removing existing culverts, headwalls, trail surfaces, and trees. It also includes constructing bridge abutments, improving the stream bank, and installing the prefabricated vehicular-rated bridge. Bids must be submitted electronically through BidNetDirect.com by 10:00 A.M. on Friday, December 4, 2026. Bidders must upload completed bid forms, signed documents, and required attachments. A bid bond or certified check of 5% of the bid is required with the proposal. The successful bidder must also provide a 100% performance bond and a 110% labor and material payment bond.