What the buyer needs
AI summaryThe College of Coastal Georgia is replacing the air handler at the Coffin Gym on its Brunswick Campus. This project involves electrical work, including removing and replacing lighting and emergency lighting.
Scope of work
- Replacing Air Handling Unit AH-G-1 with fan array
- Replacing existing HW pump HP-G-1 and pump starter
- Replacing existing CHWR/S piping to existing chilled water pump CP-G-1
- Replacing existing HVAC actuators
- Removing and reinstalling duct smoke detectors
- Replacing four existing fluorescent strip fixtures with four new LED strip fixtures
- Replacing existing emergency lighting wall pack with new 90-minute backup LED unit
- Providing electrical feeders for new equipment, VFD, and HVAC actuators
