Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

OpenSolicitation IFB/CON/DOT/2604-1260247

IFB for Traffic Signal Upgrades at Joseph E. Lowery and Lee Street Locations

Buyer
City of Atlanta
Place of performance
City of Atlanta (Lee Street at West End Avenue, Joseph E. Lowery Boulevard at Beecher Street, and Joseph E. Lowery Boulevard at Cunningham Place)
Submission deadline
Nov 19, 20262:00 PM EST

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The City of Atlanta is soliciting bids for traffic signal upgrades at Joseph E. Lowery and Lee Street locations. Offerors must be qualified and experienced to provide these services. Offerors must submit all required Office of Contract Compliance (OCC) forms and documentation. This includes a Subcontractor Utilization Plan and a Covenant of Non-Discrimination Form. Bids are due by November 19, 2026, at 2:00 PM ET via ATLcloud. Questions must be submitted in writing by October 29, 2026, at 12:00 PM ET.

Scope of work

  • Furnish and install materials per GDOT and City of Atlanta specifications
  • Traffic signal upgrades at Lee Street at West End Avenue
  • Traffic signal upgrades at Joseph E. Lowery Boulevard at Beecher Street
  • Traffic signal upgrades at Joseph E. Lowery Boulevard at Cunningham Place
  • Install detectors, signal cabinets, and pedestrian push buttons
  • Provide all equipment, personnel, traffic control, and aerial lift/bucket trucks
  • Submit a work schedule considering minimum traffic disruptions

Minimum qualifications

  • Prime Offerors must be certified as a Small Business Enterprise (SBE) with the City of Atlanta
  • Dominant NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors

Documents to include with your response

  • Federal forms
  • Contractor Data Forms (A-H)
  • Contractor Health and Safety Requirements (EHS Guide)
  • OCC Covenant of Non-Discrimination Form
  • OCC Form 2 - Good Faith Efforts
  • OCC Form 3 - Subcontractor Utilization Plan
  • OCC Letter(s) of Intent for each Subcontractor
  • OCC Diversity Firm Termination/Substitution Acknowledgement Form
  • Cost Sheet (Schedule of Values)
  • Signed and dated letter of Surety and insurance broker letter

How to submit

Method
Electronic via ATLcloud (Oracle Cloud)
Instructions
Submit bids and cost sheet separately through ATLcloud / Oracle Cloud. Late submissions will not be accepted.