What the buyer needs
AI summaryThe Navy seeks repair, testing, and inspection services for aircraft covers and access panels. The contractor will be responsible for ensuring all assets meet established repair turnaround times (RTAT).
The required RTAT is 90 days after receipt of the asset. The contractor must also provide a throughput constraint for each national stock number (NSN).
The induction expiration date is 365 days after the contract award date. Assets received after this date require bilateral agreement for repair.
All contractual documents are considered issued when deposited in the mail, faxed, or sent electronically. The government's acceptance of the contractor's proposal constitutes bilateral agreement.
Incumbent and award research
No incumbent history found for this requirement. The notice does not cite a current contract, and no earlier award from this buying office matches it.
Market context
Awards in the same category (Other Aircraft Parts and Auxiliary Equipment Manufacturing). This is not this requirement's award history.
Top vendors in this category: Department of Defense, NAICS 336413, since Oct 1, 2024
124,879 contract awards in this NAICS over the period.
- 1. LOCKHEED MARTIN CORPORATION$4.0B
- 2. NORTHROP GRUMMAN SYSTEMS CORPORATION$2.7B
- 3. DEFENSE SYSTEMS AND SOLUTIONS$2.5B
- 4. RTX CORPORATION$2.4B
- 5. L3HARRIS TECHNOLOGIES INTEGRATED SYSTEMS L.P.$2.2B
Source: USAspending.gov federal award data (U.S. federal public data). A contract is called the incumbent only when the notice or its documents cite it by number.
