What the buyer needs
AI summaryThe County of Greenville seeks proposals for the partial closure construction of the Class 2 Unit 2 Landfill. The project includes constructing a stormwater pond, subgrade preparation, structural fill for a perimeter berm, and an access road. Key deliverables include approximately 301,000 cubic yards of excavation and 120,000 cubic yards of structural fill. The soil borrow area is within the Unit 2 Landfill footprint and has been cleared.
