What the buyer needs
AI summaryThis project involves pavement removal, core out and replacement of soil with granular backfill, and installation of seven-inch Portland Cement Concrete pavement. It also includes intake modifications, ditch check stabilization, and stream bank stabilization as required.
Additional work includes incidental items necessary for project completion as determined by the plans and the DNR Construction Inspector. Project documents are available for review and pickup at Beeline and Blue.
Questions regarding the project, bidding, or contract procedures must be emailed to DNR Procurement by noon on the Friday before the bid letting. Substitution requests should also be directed to DNR Procurement via email.
The bid letting is scheduled for December 17, 2026, at 11:00 AM Central Standard Time. Project documents can be obtained from Beeline and Blue, located at 2507 Ingersoll Ave, Des Moines, IA.
