What the buyer needs
AI summaryThe project involves adding a concrete water control structure with stop logs and associated piping to manage water levels on 12 Mile Lake in Emmet County. Project documents are available at Beeline and Blue in Des Moines, Iowa.
Questions about the project, substitutions, or bidding procedures should be directed to DNR Procurement. These requests must be emailed by noon on the Friday before the bid letting.
Bid letting occurs on December 17, 2026, at 11:00 AM Central Standard Time. Further information can be obtained by visiting www.beelineandblue.com or contacting (515) 244-1611.
