What the buyer needs
AI summaryThe government authority in California requires engineering and design services for berth utility improvements. This includes preparing plans for a larger berths restoration project, with construction planned for the 2027/2028 winter work window.
The project involves four berthing structures with various components like concrete platforms, gangways, barges, fenders, and mooring dolphin piles. Utility systems include fuel, water, sewage, bilge, air, electrical power, and communication lines.
Specific tasks include repairs to camel structures, flotation and fendering replacement, coating renewal, and modifications to camel utilities and lighting. A fixed containment boom replacement is also required.
All questions regarding this solicitation must be submitted no later than October 30, 2026. The submission deadline for the proposal is November 13, 2026.
Scope of work
- Berth utility improvements engineering and design services
- Preparation of plans, technical specifications, construction cost estimates, and time schedule
- Repairs to camel structures
- Flotation replacement
- Fendering replacement
- Coating renewal
- Camel utilities modifications
- Camel lighting replacement
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| TEAM QUALIFICATIONS AND EXPERIENCE | 40 |
| PROJECT UNDERSTANDING AND APPROACH | 40 |
| FIRM’S QUALIFICATIONS | 20 |
Minimum qualifications
- Consultant team must include licensed Professional Engineers
- Registration on the District's Procurement Portal
Documents to include with your response
- Statement of Qualifications and Proposal (SOQ&P)
- Transmittal letter
- Resumes and references for team members
- Copies of Professional Engineer licenses
- Sample Certificate of Insurance
- Exhibit 4 Exception Form (if requesting modifications to Sample Agreement)
- Exhibit 5 Cost Proposal Form (uploaded separately)
- Exhibit 6 Indemnification Form (if submitting confidential materials)
- Exhibit 8 Prime Consultant and Subcontractor/Subconsultant/Supplier Report
- Exhibit 9 Description of the Selection Process of Subcontractors/Subconsultants/Suppliers
How to submit
- Method
- Electronic via the District's Procurement Portal
- Instructions
- Submitted via https://ggbhtd.bonfirehub.com. Cost proposal form (Exhibit 5) must be uploaded to Bonfire separately from the technical proposal.