Geospatial Mapping Analysis and Modelling Service
- Client
- Greenville, SC.
- RFP Number
- GIS-2088
- Posted
- 10/8/2026
- Category
- GIS Services
- Budget
- Looking for Proposal
- NAICS
- —
- Set-aside
- —
- Contact
- —
Description
AI GeneratedUpstate Forever seeks an experienced onshore US consultant to perform geospatial mapping analysis and modeling focused on the Upper Savannah River Basin in South Carolina. The project requires high-resolution maps on a 30m x 30m raster grid, Federal Geographic Data Committee-compliant GIS datasets, metadata, and a final report detailing water protection priorities, land conservation needs, and current nutrient and sediment exports to waterways. Applicants must submit a single PDF proposal by November 6, 2026, at 5:00 p.m. ET via email to Josie Newton at [email protected]. Submissions must detail relevant experience, project staff, a work plan, references, and a fee proposal not exceeding $50,000. Project work will begin in January 2027, with all deliverables due by November 1, 2027. An evaluation team will review submissions and may conduct interviews prior to making an award.
Key solicitation details
AI-extracted from 10.pdf. Confirm against the original documents before bidding.
Upstate Forever is seeking an experienced consultant to conduct a geospatial mapping analysis and modeling service in the Upper Savannah River Basin of South Carolina. The project aims to identify critical drinking water protection areas and current nutrient and sediment exports. Experienced consultants with relevant GIS mapping and modeling expertise are eligible to submit proposals.
- Issued by
- Upstate Forever
- Proposals due
- November 6, 2026 at 5:00 p.m. ET
- Anticipated consultant selection
- December 2026
- Proposal selection confirmed
- end of January 2027
- Mapping process begin
- early 2027
- Final deliverables due
- November 1, 2027
- How to submit
- Electronic via email
- Submission details
- Submit electronically via email as one complete proposal in PDF format clearly labeled Response to EC-SDC Mapping RFP to [email protected]
- Contract term
- Early 2027 through November 1, 2027
- Estimated value
- not to exceed $50,000 in total project cost
- Place of performance
- Upper Savannah River Basin, South Carolina
- Insurance and bonding
- The selected Consultant will be required to comply with all applicable federal, state, and local laws, regulations, permits, insurance requirements, and contractual provisions.
- Funding
- South Carolina Department of Environmental Services (SCDES) Emerging Contaminants in Small or Disadvantaged Communities (EC-SDC) Grant Program
Scope of work
- Map of most important lands to reduce or prevent future sediment loss
- Map of most important lands to reduce nutrient runoff
- Map of Critical Drinking Water Protection Areas
- Map of most important lands to protect high-quality water resources
- Map of Current Exports of nutrient exports to waterways
- Map of Current Exports of sediment export to waterways
- Map of all pollutant exports to waterways
- Final report suitable for internal and external distribution
Minimum qualifications
- Relevant experience highlighting similar work over the last 5 years
Documents to include with the bid
- Project descriptions of relevant experience (3 to 5 projects, max 2 pages per project)
- Organizational chart and brief biographies or resumes (1 page per person)
- References from two organizations (max 1 page)
- Proposed project schedule (max 2 pages)
- Proposed fee and description of anticipated expenses (max 10 pages)
- Firm name, physical address, website URL, and contact details (1 page)
Verify important details
Document checkConfirm submission instructions and amendments with the issuing agency before responding.
Personalized fit score
Sign up free to see how well this opportunity fits your company — based on your saved profile.
Sign up to see your fit score