About this opportunity
AI summaryThe Federal Law Enforcement Training Center requires all labor, materials, supplies, equipment, management, and supervision to perform designated construction, changes, and repairs at its Cheltenham, Maryland facility. Work will be ordered through individual task orders governed by Technical Specifications for Divisions 1 through 48 and applicable building codes. Key personnel must include an approved superintendent and an independent Quality Control Manager, with resumes demonstrating Simplified Acquisition of Base Engineer Requirements or Job Order Contracts experience of at least one year on projects valued at $1.5 million or higher. The selected contractor must submit a Quality Control Plan within 10 days after award, furnish an RSMeans data textbook within 45 days, and provide task order proposals within 14 calendar days of a government request.
Scope of work
- General construction, maintenance, and alterations designated in individual task orders
- Architectural finishes, carpentry, structural work, earthwork, pavement, and concrete
- Utilities, heating, ventilation, air conditioning, piping, plumbing, and fire alarm work
- Minor design services provided by certified or registered personnel when requested
- Preparation of cost proposals using Gordian RSMeans data and detailed construction schedules
- Traffic control including street blockades, traffic cones, and flagmen
- Daily site cleanup and final cleanup of areas affected by construction
- Preparation and submission of as-built record drawings and project close-out documentation
Minimum qualifications
- Project Manager with minimum 10 years combined experience, including 5 years as PM on IDIQ/SABER/JOC contracts valued $1.5M-$27.5M
- Project Manager with High School education, 30-hour Construction OSHA Certification Card, and MS Project proficiency
- Superintendent with minimum 5 years combined experience, including 5 most recent years as Superintendent on similar contracts
- Superintendent with High School education and 30-hour Construction OSHA Certification Card
- Quality Control Manager with minimum 10 years cumulative experience, including 5 most recent years exclusively as QC Manager
- Quality Control Manager certified in Construction Quality Management (CQM) for Contractors and holding a 30-hour OSHA Card
- Project Manager, Superintendent, and QC Manager familiar with USACE Manual EM 385-1-1 and/or OSHA 1926 Construction
Documents to include with your response
- Written delegation of authority for Project Manager to bind Contractor
- Written delegation of authority for Superintendent to bind Contractor
- Resumes for Key Personnel
- Contractor Quality Control Plan
- CQC Daily Report Form
- Accident Prevention Plan
- Safety Data Sheets (SDS)
- Task order cost proposals, construction schedules, and Statements of Work
- As-built record drawings
Key dates
- Accident Prevention Plan and CQC Plan submission
- within 10 days after award
- QC Manager course certification deadline if not certified
- within 30 days of award
- OSHA 30-hour certification card deadline if not held
- within 90 days after contract award
- Task order contractor proposals due
- Generally within fourteen (14) calendar days from date of request
- Final Inspection or BOD request due
- minimum of five (5) business days in advance
Contract details
- Place of performance
- Federal Law Enforcement Training Center, Cheltenham, MD
Federal notice details
- Solicitation number
- 70LCHE27RPFB00001SS
- Agency
- Department of Homeland Security
- Buying office
- Federal LAW Enforcement Training Center › Fletc Procurement Cheltenham Office
- Notice type
- Sources Sought
- Responses due
- Nov 18, 2026, 10:00 AM ET
- Posted on SAM.gov
- Nov 4, 2026
- NAICS
- 23
- Set-aside
- No Set aside used
- Place of performance
- Cheltenham, MD, 20588
- Contracting contact
- Chris Dills
chris.d.dills@fletc.dhs.gov
Source: SAM.gov. Read the official notice for the complete description and current instructions.
Incumbent and award research
Likely prior awards for this requirement
Likely matchAwarded by the same buying office (70LCHE) with descriptions matching "fletc cheltenham" or "cheltenham", performed in MD. The notice does not name its current contract, so confirm before relying on it.
| Vendor and award | Value | Ends |
|---|---|---|
| BELT BUILT CONTRACTING, LLC70LCHE26FPFB00062 · INSTALL ELECTRICAL SWITCHES TO REPLACE T-SPLICES AT FLETC CHELTENHAM MD. | $1.9M | Jun 14, 2028 |
| DGI-ATI JV LLC70LCHE23CPFB00001 · FACILITIES OPERATIONS SUPPORT SERVICES (FOSS) IN SUPPORT OF THE FEDERAL LAW ENFORCEMENT TR | $19.0M | Sep 30, 2027 |
| BELT BUILT CONTRACTING, LLC70LCHE26FPFB00058 · VARIOUS ASPHALT REPAIRS AT FLETC CHELTENHAM MD. | $1.5M | Aug 27, 2027 |
| BELT BUILT CONTRACTING, LLC70LCHE26FPFB00057 · COMPLETE REPAIRS IDENTIFIED IN THE 2023 FCA FOR FLETC CHELTENHAM MD. | $195.8K | Apr 28, 2027 |
| BELT BUILT CONTRACTING, LLC70LCHE26FPFB00065 · REPLACE B22 ROOF AT FLETC CHELTENHAM MD. | $156.6K | Apr 14, 2027 |
Source: USAspending.gov federal award data (U.S. federal public data). A contract is called the incumbent only when the notice or its documents cite it by number.
