Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

Open

Planning Services for Sea Level Rise Resiliency and Feasibility Studies in Arcata, California

Buyer
The City of Arcata
Place of performance
City of Arcata, California (Arcata Shoreline, Jolly Giant Creek, Butcher Slough, and Little Lake Industries site); offsite work permitted per listing.
Submission deadline
Jan 7, 2027

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The government authority in Arcata, California, requires planning services for sea level rise resiliency and feasibility studies. The selected consultant will lead the development and implementation of a Community Engagement Strategy, incorporating various engagement methods.

Engagement strategies will include stakeholder meetings, public workshops, online surveys, and targeted outreach to environmental justice communities and local Tribes. Tribal engagement may involve government-to-government consultation and coordination on cultural resource protection.

The work integrates technical feasibility, economic considerations, environmental impacts, and community priorities. A pre-bid meeting is scheduled for December 8, 2026, with all questions due by December 17, 2026.

Scope of work

  • Arcata Shoreline Sea Level Rise Adaptation Pathways Plan covering approximately 4.75 miles of shoreline.
  • Preliminary geotechnical investigations and technical and economic feasibility analyses for shoreline adaptation strategies.
  • Jolly Giant Creek and Butcher Slough feasibility study report and analysis of alternatives.
  • Hydrologic and hydraulic model calibration, geotechnical assessment, and CEQA special studies.
  • 30% design plans for a multi-benefit sea level rise and salmonid habitat restoration project.
  • Little Lake Industries 11-acre property redevelopment feasibility study evaluating site conditions and market opportunities.
  • Community and Tribal engagement strategy, including workshops, surveys, and stakeholder meetings.
  • Monthly invoices and quarterly progress reports supporting State agency grant reporting.

How proposals are evaluated

CriterionWeight / scoring
Firm Qualifications and Team Organization15 POINTS
Scope of Work, Schedule of Work, and Project Understanding50 POINTS
Capacity to perform, past performance on similar projects, and references20 POINTS
Completeness and Organization of Proposal10 POINTS
Certification as a Disadvantaged Business Enterprise5 POINTS

Minimum qualifications

  • Experience in conducting community engagement, technical analyses, environmental studies, and economic assessments.
  • Minimum of three (3) comparable projects completed within the past five (5) years.
  • Minimum of two (2) reference projects performed within the past five (5) years.
  • Valid City of Arcata Business License required on or before contract execution.

Documents to include with your response

  • Signed transmittal letter stating proposal is a firm offer for 180 days
  • Consultant Qualifications and Experience with work samples
  • Resumes and references for all key team members
  • Detailed Scope of Work Statement(s) and project schedule
  • Cost Control and Budgeting Methodology
  • Relevant Experience and References (minimum three comparable projects)
  • Sub-consultant roles and duties, if applicable
  • Proof of DBE, MBE, or WME certification, if applicable
  • Separate Cost Proposal in fee schedule format itemized by task

How to submit

Method
Electronic via email or physical delivery of USB drive or compact disc
Instructions
Submit one (1) electronic copy in PDF format via email attachment or on a USB drive or compact disc in a sealed envelope to 736 F Street, Arcata, CA 95521. Cost proposals must be submitted as a separate PDF file or in a separate sealed envelope.