What the buyer needs
AI summaryThe government authority in Springfield, Vermont, requires manufactured housing units service. The units must be rated for Vermont, including meeting Wind Zone I, Middle Snow, and Thermal Zone 3 standards; they must also feature 25-year shingles and exterior GFCI outlets.
The service includes installation, which requires a detailed work schedule covering delivery, placement, and utility connections. Blocking and leveling of the home are specified, with blocking a minimum of 16 inches and a maximum of 22 inches tall.
Installation also involves perimeter blocking, appropriate tie-down installation, and connection to water with a shut-off valve and heat tape. The contract period for this service will be for one year.
All questions regarding this solicitation must be submitted no later than December 9, 2026. The submission deadline for the bid is December 18, 2026.
