What the buyer needs
AI summaryKey tasks include replacing existing pipe infrastructure, valves, and fire hydrants, installing new services, and connecting existing mains. The project also specifies requirements for pipe bedding, fire hydrant installation, and valve box construction.
Scope of work
- Construct Eastern Water Distribution System Reliability Project across multiple roads
- Replace existing pipe infrastructure, valves, and fire hydrants
- Install new services and connect existing mains
- Perform driveway crossings (rock/concrete) and boring and jacking
- Provide erosion, sedimentation, and pollution control
- Complete clean-up and restoration including grading, grassing, landscaping, and pavement repairs
- Provide as-built drawings on an ongoing basis
Minimum qualifications
- Pre-qualification of bidders is required
- Possess all licenses and permits required by federal, state, and local law
- Hold a Georgia Utility Contractor License (number written on face of bid)
- Participate in the E-Verify Program pursuant to SB 529
- Prepared to proceed with work within three weeks of bid opening
Documents to include with your response
- Pre-qualification package
- Bid
- Non-Collusion Affidavit of Prime Bidder
- Corporate Certificate
- Statement of License Certificate
- E-Verify Affidavit
- DBE Compliance Form
- Certification Regarding Equal Employment Opportunity
- Certification Regarding Debarment, Suspension, & Other Responsible Matters
- EPA Forms 6100-2, 6100-3, and 6100-4 (if using DBE subcontractors)
How to submit
- Method
- Sealed Proposals
- Instructions
- Received in the Auditorium of the Dalton Utilities Administration Building at 1200 V.D. Parrott Jr. Parkway until 2:00 P.M. local time December 14, 2026. Only bids from properly pre-qualified bidders who attended the mandatory pre-bid meeting will be opened.