What the buyer needs
AI summaryThe Texas A&M University System is seeking statements of qualifications for an Architect/Engineer firm for the Domestic Water Well #6 Upgrade project. The project involves redrilling and replacing the existing Well #6, originally constructed in 1960. The project includes constructing a new replacement well, installing a high-horsepower pump, and performing electrical upgrades. Additional work includes a pump pad, cooling tower, SCADA integration, and civil/site work. An optional pre-response site visit is scheduled for November 13, 2026. Statements of qualification must be uploaded to e-Builder by 2:00 p.m. CST on Tuesday, December 1, 2026.
Scope of work
- Construction of a new 24-inch Simsboro replacement well meeting BVGCD, TCEQ, and TDLR requirements
- Installation of a 1,000-HP, 4,160-V vertical turbine pump
- Electrical upgrades including new medium-voltage transformation package, switchgear, protective relays, conduit, and conductors
- Installation of a new emergency generator with load bank connection
- Construction of a reinforced pump pad
- Installation of a cooling tower
- SCADA and communications integration
- Plugging and abandoning or reclassifying existing 1960 Well #6 in accordance with BVGCD requirements
Documents to include with your response
- State of Texas Subcontracting Plan (SP) form
How to submit
- Method
- Electronic via e-Builder
- Instructions
- Submissions must be uploaded to e-Builder using the provided access link.