What the buyer needs
AI summaryThis project involves selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure, and seeding for a traditional breakpoint nutrient reduction wetland. The scope includes approximately 62,120 cubic yards of earthwork, 1,044 square feet of steel sheetpile, an Aluminum CMP water control structure, and 814 linear feet of tile installation.
Additional work includes 57 linear feet of Aluminum CMP drawdown pipe, two Aluminum CMP inlet risers, 618 tons of riprap, 104 cubic yards of concrete grout, and 23.1 acres of seeding. The estimated construction cost range for this project is $475,000 to $575,000.
Construction is expected to be completed by November 1st, 2027, with seeding to follow by December 15, 2027. The project specifications were prepared by Ducks Unlimited, Inc. and certified by a licensed Professional Engineer.
The solicitation requires proper pollution control measures, including management of chemical pollutants and sediment. Seeding mixtures must include a minimum of five native grasses and ten native forbs, with specific seed density requirements.