What the buyer needs
AI summaryThis solicitation is for antennas, connectors, and related components and cabling. The purchase includes an estimated quantity of transceivers, DAC cables, and patch cables; Vendors are responsible for specifying the correct amounts in their bids.
A mandatory site walkthrough is scheduled for December 2, 2026, at 10:00 AM Eastern Standard Time at 201 N. 3rd St., Dennison, OH 44621. Vendors may need to travel to other district-owned sites; Failure to attend this walkthrough will result in disqualification.
Responses are due by 3:00 PM Eastern Standard Time on December 16, 2026. All questions and answers from the site walkthrough will be posted publicly.
Scope of work
- 39 POE+ access switches and 2 Layer 3 core switches
- Necessary transceivers, cables, adapters, or media converters
- Mounting trays, rails, and rack mounting equipment
- Installation within racks and configuration of all switches
- Testing and verification of network connectivity, routing, and redundant uplinks
- Configuration backups, administrator credentials, and updated network diagram
- Equipment inventory and basic administrator training
- Two quotes: without cloud management licensing and with 5-year cloud management licensing
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Cost of E-Rate eligible equipment and services | 30 |
| Ability to deliver service within the district’s projected timeline | 15 |
| Vendor quote meets district's minimum specifications | 20 |
| Ability of vendor to service/support installed systems | 15 |
| Prior experience with vendor | 20 |
Minimum qualifications
- Attendance at the required site walkthrough on 12/2/2026
- Vendor must bid on all services requested in the RFP
- Vendor must be willing to provide discounted bills
- All equipment must be new with manufacturer’s warranty
Documents to include with your response
- Summary of the project as proposed
- Company background and qualifications
- Detailed proposed solution and equipment datasheets
- Project timeline
- All costs and fees, including breakdown and length of manufacturer’s warranty
- Two quotes: without and with five-year cloud management licensing
- Equivalency documentation if proposing different equipment or services
How to submit
- Method
- Instructions
- All proposals, questions, and requests for clarification must be submitted by email to William Bonanno.
