What the buyer needs
AI summaryThe Cobb County-Marietta Water Authority seeks to replace approximately 37,000 linear feet of 36-inch water main in Southwest Cobb County, Georgia. This project involves replacing existing prestressed concrete cylinder pipe and ductile iron pipe with new zinc-coated, double bonded-joint, and double poly-wrapped ductile iron pipe.
The replacement route begins at Casteel Road and Friendship Church Road, proceeding south along Villa Rica Road and Old Villa Rica Road. It then turns east onto Macedonia Road, ending before Barrett Parkway with a tie-in to existing infrastructure.
Bids are due by 10:00 AM local time on December 22, 2026. Only pre-qualified contractors with the Cobb County-Marietta Water Authority for 36-inch or larger water mains may bid; A mandatory pre-bid conference is scheduled for December 8, 2026.
Questions must be submitted by December 14, 2026, at 10:00 AM via the Freese and Nichols website. Substantial completion is required within 1430 days, and final completion within 1460 days from the commencement date.